TEXAS · WELLS · HOWARD COUNTY · API 42-227-35235 · DISTRICT 7B
Kloh -A- #15
Howard County · Howard Glasscock (Consolidated) field · Injection · Vertical
Kloh -A- #15 (API 42-227-35235) is a well in Howard County operated by Basa Resources Inc., completed February 13, 2010 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued August 15, 1997, permitted to 2,625 ft.
It was permitted by Oryx Energy Company and has since transferred to Basa Resources Inc. on the wellbore schedule.
Completion filings report one formation top, including San Andres.
Its 2 leases have reported 945K barrels of oil and 8.2K mcf of gas since January 1993, last reporting in July 2026. The leases carry 36 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 162K barrels injected in the 12 months reported through December 2025.
Operator of record
Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 12, 2026
- Permits on file
- 472
- Phone
- (214) 580-5206
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sheridan Production Company LLC |
| Production reports | Basa Resources, Inc.through Apr 2026 |
| Latest permit | Oryx Energy CompanyAug 15, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,625
- total depth, ft
- 1
- permits on file
- Aug 15, 1997
- last permit issued
- Feb 13, 2010
- completed
- 945K
- cumulative oil, bbl
- 8.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 13, 2010
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 36 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kloh -A- O-10-41281 | Howard Glasscock (Consolidated) | Basa Resources, Inc. | 15 | 336K | 35 | Dec 2011 – Jul 2026 |
| Kloh -A- O-10-2813 | Howard Glasscock | Sheridan Production Company, LLC | 21 | 609K | 8.17K | Jan 1993 – Jun 2012 |
Oil, barrels lease total
Last 12 months 26,381 · prior 12 23,280(+13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southland Royalty CompanyJan 1993 → Feb 1996
- 2Meridian Oil Inc.Mar 1996 → Mar 1996
- 3Bargo Energy CompanyApr 1996 → Sep 1996
- 4Oryx Energy CompanyOct 1996 → Mar 1999
- 5Kerr-McGee CorporationApr 1999 → Sep 1999
- 6Kerr-McGee Oil & Gas Onshore LLCOct 1999 → Nov 2002
- 7Aethon I LPDec 2002 → Nov 2007
- 8Sheridan Production Company, LLCDec 2007 → Mar 2020
- 9FDL Operating, LLCApr 2020 → Apr 2022
- 10Basa Resources, Inc.May 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 466111-99 | Drill | Oryx Energy Company | Aug 11, 1997 | Aug 15, 1997 | Sep 8, 1997 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 13, 2010 | Kloh -A- O-10-41281 | Howard Glasscock (Consolidated) | Basa Resources Inc. | Injection | 2,625 |
| Feb 13, 2010 | Kloh -A- O-10-2813 | Howard Glasscock | Sheridan Production Company LLC | Not on Schedule | — |
| Sep 25, 1997 | Kloh -A- O-10-2813 | Howard Glasscock | Sheridan Production Company LLC | Not on Schedule | — |
| Sep 25, 1997 | Kloh -A- O-10-2813 | Howard Glasscock | Sheridan Production Company LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,696 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 2,000 | 696 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,144 | 2,331 | Perforated |
| 2,144 | 2,426 | Perforated |
| 2,331 | 2,426 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 402 | 12.25 | 275 S |
| 9.625 | 410 | 12.25 | 275 S |
| 7 | 2,600 | 8.75 | 5,800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 15, 2012 | Mar 3, 2010 | — |
| 00 | Jul 26, 2010 | Mar 3, 2010 | — |
| 00 | Jun 17, 2010 | Oct 24, 1997 | — |
| 00 | Jul 16, 2001 | Oct 24, 1997 | — |
| 00 | May 8, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-35235 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-35235 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 162K
- bbl, last 12 reported months
- 13M
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000086813 | H-1 Injection | Active | 5,000 | 1,000 | 2,000–3,000 |
| 000086814 | H-1 Injection | Canceled Jul 24, 2009 | 1,500 | 1,000 | 2,300–2,700 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 162,027 · prior 12 578,518(-72%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22735235, documented in the API reference.