TEXAS · WELLS · HOWARD COUNTY · STERLING 15 LEASE · API 42-227-36256 · DISTRICT 7B

Sterling 15 #1

Shut in

Howard County · Spraberry (Trend Area) field · Shut In  · Vertical

Sterling 15 #1 (API 42-227-36256) is a well in Howard County operated by Highpeak Energy Holdings LLC, completed November 20, 2024 and listed as shut in on the RRC schedule, shut in February 1, 2023.

The RRC has issued one drilling permit, issued September 1, 2009, permitted to 6,445 ft.

It was permitted by Mariner Energy, Inc. and has since transferred to Highpeak Energy Holdings LLC on the wellbore schedule.

Completion filings report one formation top, including Wolfcamp.

Its lease has reported 17.7K barrels of oil and 43.6K mcf of gas since October 2009, last reporting in July 2026.

Operator of record

Highpeak Energy Holdings LLC

Permitted by Mariner Energy, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2024
Permits on file
896
Phone
(817) 850-9200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHighpeak Energy Holdings LLC
Production reportsHighpeak Energy Holdings, LLCthrough Nov 2022
Latest permitMariner Energy, Inc.Sep 1, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,445
total depth, ft
1
permits on file
Sep 1, 2009
last permit issued
Nov 20, 2024
completed
17.7K
cumulative oil, bbl
43.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 20, 2024
Shut in
Feb 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sterling 15 O-10-39742Spraberry (Trend Area)Highpeak Energy Holdings, LLC117.7K43.6KOct 2009 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mariner Energy, Inc.Oct 2009 → Nov 2010
  2. 2Apache CorporationDec 2010 → Nov 2019
  3. 3Bayswater Operating Company LLCDec 2019 → Jun 2021
  4. 4Highpeak Energy Holdings, LLCJul 2021 → Nov 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
684522-99DrillMariner Energy, Inc.Aug 26, 2009Sep 1, 2009Sep 16, 200911,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 20, 2024Sterling 15 O-10-39742Spraberry (Trend Area)Highpeak Energy Holdings LLCShut In · shut in Feb 1, 20236,445

Formation tops

As filed on W-2/G-1. Subsea from 2,312 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp6,196-3,884

Perforations

Perforated and open-hole intervals.

FromToType
6,1966,214Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37546517.5375 S
8.6253,53611820 S
5.56,4317.875560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 2025Sep 30, 2025—
00May 26, 2010Nov 6, 2009Yes
00Mar 5, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22736256, documented in the API reference.