WELL · 42-227-36422 · DISTRICT 8

Wilkinson Ranch #3901

N

Howard County · Spraberry (Trend Area) field  · Vertical

Wilkinson Ranch #3901 (API 42-227-36422) is a well in Howard County operated by Oxyrock Operating LLC, completed October 20, 2010.

The RRC has issued one drilling permit (amended once), issued July 2, 2010, permitted to 11,000 ft.

It was permitted by Crownquest Operating, LLC and has since transferred to Oxyrock Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Spraberry, Strawn, Mississippian.

Its 2 leases have reported 2.94M barrels of oil and 12M mcf of gas since August 2010, last reporting in July 2026. The leases carry 47 wells, so these are lease totals, not this well alone.

Operator of record

Oxyrock Operating LLC

Permitted by Crownquest Operating, LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 22, 2026
Permits on file
392
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOxyrock Operating LLC
Production reportsOxyrock Operating, LLCthrough Apr 2026
Latest permitCrownquest Operating, LLCJul 2, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
2
permits on file
Jul 2, 2010
last permit issued
Oct 20, 2010
completed
2.94M
cumulative oil, bbl
12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 20, 2010
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 47 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilkinson Ranch O-10-40510Spraberry (Trend Area)Oxyrock Operating, LLC462.9M11.8MAug 2010 – Jul 2026
Wilkinson Ranch 39 O-10-44880Spraberry (Trend Area)Oxyrock Operating, LLC138.2K168KJun 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 532,024 · prior 12 483,844(+10%)

020K40K60K202420252026

Oil, barrels lease total

Last 12 months 71,114 · prior 12 81,607(-13%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crownquest Operating, LLCAug 2010 → Jul 2024
  2. 2Oxyrock Operating, LLCAug 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
698263-98DrillCrownquest Operating, LLCDec 28, 2010Jul 2, 2010Aug 24, 201011,000
698263-99DrillCrownquest Operating, LLCJun 28, 2010Jul 2, 2010Aug 24, 201011,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-40510————
—— O-10-44880————

Formation tops

As filed on W-2/G-1. Subsea from 2,564 ft elevation.Download CSV →

FormationMD ftSubsea
Spraberry7,528-4,964
Strawn9,452-6,888
Mississippian10,190-7,626

Perforations

Perforated and open-hole intervals.

FromToType
7,52810,313Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37537217.5400 S
8.6254,223111,000 S
5.510,4007.8751,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 2014Dec 14, 2010Yes
00Sep 27, 2011Dec 14, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22736422, documented in the API reference.