WELL · 42-227-37397 · DISTRICT 8

Beall 28 #1

Y

Howard County · Spraberry (Trend Area) field · Producing  · Vertical

Beall 28 #1 (API 42-227-37397) is a well in Howard County operated by Oxyrock Operating LLC, completed September 19, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 5, 2013, permitted to 10,183 ft.

It was permitted by Big Star Oil & Gas, LLC and has since transferred to Oxyrock Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Dean, Wolfcamp, Atoka, Mississippian.

Its lease has reported 172K barrels of oil and 1.21M mcf of gas since September 2013, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Oxyrock Operating LLC

Permitted by Big Star Oil & Gas, LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 22, 2026
Permits on file
392
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOxyrock Operating LLC
Production reportsOxyrock Operating, LLCthrough Apr 2026
Latest permitBig Star Oil & Gas, LLCMar 5, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,183
total depth, ft
1
permits on file
Mar 5, 2013
last permit issued
Sep 19, 2013
completed
172K
cumulative oil, bbl
1.21M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 19, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beall 28 O-10-44322Spraberry (Trend Area)Oxyrock Operating, LLC4172K1.21MSep 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 170,218 · prior 12 126,793(+34%)

010K20K202420252026

Oil, barrels lease total

Last 12 months 6,158 · prior 12 8,454(-27%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Big Star Oil & Gas, LLCOct 2013 → May 2016
  2. 2Callon Petroleum Operating CoJun 2016 → Nov 2020
  3. 3Crownquest Operating, LLCApr 2021 → Jul 2024
  4. 4Oxyrock Operating, LLCAug 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
757802-99DrillBig Star Oil & Gas, LLCMar 4, 2013Mar 5, 2013Jul 21, 201312,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-44322————

Formation tops

As filed on W-2/G-1. Subsea from 2,562 ft elevation.Download CSV →

FormationMD ftSubsea
Dean7,492-4,930
Wolfcamp7,688-5,126
Atoka9,581-7,019
Mississippian9,952-7,390

Perforations

Perforated and open-hole intervals.

FromToType
7,49210,110Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.2534117.5375 S
8.6254,50311850 S
5.510,1837.875950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 27, 2014Oct 21, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22737397, documented in the API reference.