TEXAS · WELLS · HUTCHINSON COUNTY · READ LEASE · API 42-233-30623 · DISTRICT 08

Read #11

Shut in

Hutchinson County · Panhandle Hutchinson County Fld. field · Shut In  · Vertical

Read #11 (API 42-233-30623) is a well in Hutchinson County operated by Burk Royalty CO. Ltd., completed November 17, 1978 and listed as shut in on the RRC schedule, shut in December 1, 2018.

The RRC has issued one drilling permit, issued July 31, 1978, permitted to 3,265 ft.

It was permitted by Huber, J. M., Corporation and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Its lease has reported 53.5K barrels of oil and 1.89M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 27 wells, so these are lease totals, not this well alone.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Huber, J. M., Corporation; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
384
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsBurk Royalty Co., Ltd.through Apr 2026
Latest permitHuber, J. M., CorporationJul 31, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,265
total depth, ft
1
permits on file
Jul 31, 1978
last permit issued
Nov 17, 1978
completed
53.5K
cumulative oil, bbl
1.89M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 17, 1978
Shut in
Dec 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 27 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Read O-14-4173Panhandle Hutchinson County Fld.Burk Royalty Co., Ltd.2753.5K1.89MJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 13,499 · prior 12 13,418(+1%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 718 · prior 12 845(-15%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Huber, J. M., CorporationJan 1993 → Oct 2005
  2. 2Stallion Energy LLCNov 2005 → Jun 2007
  3. 3Linn Operating, Inc.Jul 2007 → Apr 2017
  4. 4Linn Operating, LLCMay 2017 → Feb 2018
  5. 5Scout Energy Management LLCMar 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
29412-99DrillHuber, J. M., CorporationJul 31, 1978Jul 31, 1978Oct 18, 19783,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 17, 1978Read O-14-4173Panhandle Hutchinson County Fld.Burk Royalty Co. Ltd.Shut In · shut in Dec 1, 20183,265

Perforations

Perforated and open-hole intervals.

FromToType
2,6993,183Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,136—550 S
4.53,260—235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23330623, documented in the API reference.