TEXAS · WELLS · HUTCHINSON COUNTY · YAKE "D" LEASE · API 42-233-30715 · DISTRICT 08
Yake D #2
Hutchinson County · Panhandle Hutchinson County Fld. field · Vertical
Yake D #2 (API 42-233-30715) is a plugged well in Hutchinson County, plugged May 15, 1997, last operated by Linn Operating Inc..
The RRC has issued one drilling permit, issued July 12, 1979, permitted to 3,200 ft.
It was permitted by Getty Oil CO. and has since transferred to Linn Operating Inc. on the wellbore schedule.
Its lease has reported 8.98K barrels of oil and 105K mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Getty Oil Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 9, 2016
- Permits on file
- 1,401
- Phone
- (281) 840-4000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Linn Operating Inc. |
| Production reports | Linn Operating, Inc.through Sep 2010 |
| Latest permit | Getty Oil Co.Jul 12, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 1
- permits on file
- Jul 12, 1979
- last permit issued
- Aug 28, 1979
- completed
- 8.98K
- cumulative oil, bbl
- 105K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 28, 1979
- Shut in
- —
- Plugged
- May 15, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yake "D" O-14-4482 | Panhandle Hutchinson County Fld. | Linn Operating, Inc. | 4 | 8.98K | 105K | Jan 1993 – Sep 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Momentum Operating Co., Inc.Jan 1993 → Dec 1995
- 2Harken Exploration CompanyJan 1996 → Nov 2003
- 3Stallion Energy, Inc.Dec 2003 → Apr 2005
- 4Pogo Panhandle 2004, L.P.May 2005 → Jun 2007
- 5Linn Operating, Inc.Jul 2007 → May 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 52669-99 | Drill | Getty Oil Co. | Jul 12, 1979 | Jul 12, 1979 | Jul 20, 1979 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 28, 1979 | Yake D O-14-4482 | Panhandle Hutchinson County Fld. | Linn Operating Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,931 | 3,008 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,174 | 12.25 | 650 S |
| 2.375 | 2,999 | — | — |
| 5.5 | 3,164 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 19, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-30715 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-30715 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.