TEXAS · WELLS · HUTCHINSON COUNTY · KIRK -85- LEASE · API 42-233-32487 · DISTRICT 08

Kirk -85- #1

Y

Hutchinson County · Kirk (Chase) field · Producing  · Vertical

Kirk -85- #1 (API 42-233-32487) is a well in Hutchinson County operated by Latigo Petroleum LLC, completed June 7, 1992 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 26, 1992, permitted to 5,150 ft.

It was permitted by Jones Energy and has since transferred to Latigo Petroleum LLC on the wellbore schedule.

Completion filings report 4 formation tops, including T/Chase, T/Upper Krider, T/Krider, T/Winfield.

No lease production has been reported under this well’s leases.

Operator of record

Latigo Petroleum LLC

Permitted by Jones Energy; the EWA schedule now lists a different operator.

Based in
Pampa, TX
P-5 status
Active (A)
P-5 last filed
Jul 17, 2025
Permits on file
76
Phone
(806) 665-8441

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLatigo Petroleum LLC
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitJones EnergyMar 26, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,150
total depth, ft
2
permits on file
Mar 26, 1992
last permit issued
Jun 7, 1992
completed
0
cumulative oil, bbl
1.06M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 7, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kirk -85- G-14-142747Kirk (Chase)Latigo Petroleum, LLC101.06MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 10,734 · prior 12 22,882(-53%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Energy, Ltd.Jan 1993 → May 2007
  2. 2Laredo Petroleum, Inc.Jun 2007 → Jul 2013
  3. 3Enervest Operating, L.L.C.Sep 2013 → Oct 2015
  4. 4BP America Production CompanyNov 2015 → May 2017
  5. 5Latigo Petroleum, LLCJan 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
397708-98Field transferJones EnergyDec 28, 1992Mar 26, 1992—5,200
397708-99DrillJones EnergyMar 23, 1992Mar 26, 1992Apr 1, 19925,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 7, 1992Kirk -85- G-14-142747Kirk (Chase)Latigo Petroleum LLCProducing5,150

Formation tops

As filed on W-2/G-1. Subsea from 3,219 ft elevation.Download CSV →

FormationMD ftSubsea
T/Chase3,16653
T/Upper Krider3,312-93
T/Krider3,370-151
T/Winfield3,515-296

Perforations

Perforated and open-hole intervals.

FromToType
3,3223,330Perforated
3,3373,341Perforated
3,3483,352Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,79812.25940 S
4.55,1447.875400 S
4.55,1507.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 10, 1993Dec 23, 1992—
00Nov 20, 1992Oct 7, 1992Yes
00Nov 3, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23332487, documented in the API reference.