TEXAS · WELLS · HUTCHINSON COUNTY · EISENHAUER -81- LEASE · API 42-233-32543 · DISTRICT 08
Eisenhauer -81- #1
Hutchinson County · Hutchinson N. (Krider) field · Producing · Horizontal · Sidetrack
Eisenhauer -81- #1 (API 42-233-32543) is a horizontal well in Hutchinson County operated by Latigo Petroleum LLC, completed October 30, 1999 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 1994 and 1999, permitted to 3,450 ft.
It was permitted by Jones Energy, Ltd. and has since transferred to Latigo Petroleum LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Cimarron, Red Cave, Panhandle, Panhandle Lm.
Its lease has reported 404K mcf of gas since December 1994, last reporting volume in March 2026.
Operator of record
Permitted by Jones Energy, Ltd.; the EWA schedule now lists a different operator.
- Based in
- Pampa, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 17, 2025
- Permits on file
- 76
- Phone
- (806) 665-8441
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Latigo Petroleum LLC |
| Production reports | Latigo Petroleum, LLCthrough Mar 2026 |
| Latest permit | Jones Energy, Ltd.Oct 12, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,450
- total depth, ft
- 2
- permits on file
- Oct 12, 1999
- last permit issued
- Oct 30, 1999
- completed
- 0
- cumulative oil, bbl
- 404K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1995 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 30, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Eisenhauer -81- G-14-154173 | Hutchinson, N. (Krider) | Latigo Petroleum, LLC | 1 | 0 | 404K | Dec 1994 – Mar 2026 |
Gas, mcf lease total
Last 12 months 280 · prior 12 143(+96%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jones Energy, Ltd.Aug 1995 → May 2007
- 2Laredo Petroleum, Inc.Jun 2007 → Jul 2013
- 3Enervest Operating, L.L.C.Aug 2013 → Oct 2015
- 4BP America Production CompanyNov 2015 → May 2017
- 5Latigo Petroleum, LLCAug 2022 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 488417-99 | Recompletion · sidetrack | Jones Energy, Ltd. | Oct 12, 1999 | Oct 12, 1999 | Sep 30, 1999 | 4,000 |
| 427251-99 | Drill | Jones Energy, Ltd. | Aug 22, 1994 | Aug 25, 1994 | Sep 6, 1994 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 30, 1999 | Eisenhauer -81- G-14-154173 | Hutchinson N. (Krider) | Latigo Petroleum LLC | Producing | 3,450 |
| Oct 30, 1999 | Eisenhauer -81- G-14-154173 | Hutchinson N. (Krider) | Latigo Petroleum LLC | Producing | 3,450 |
Formation tops
As filed on W-2/G-1. Subsea from 3,220 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cimarron | 1,800 | 1,420 |
| Red Cave | 2,040 | 1,180 |
| Panhandle | 2,370 | 850 |
| Panhandle LM | 2,370 | 850 |
| Chase | 3,162 | 58 |
| Chase | 3,163 | 57 |
| Krider | 3,309 | -89 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,309 | 3,326 | Perforated |
| 3,435 | 5,085 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,706 | 12.25 | 780 S |
| 4.5 | 3,441 | 7.875 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 23, 2000 | Jan 5, 2000 | Yes |
| 00 | Nov 30, 1995 | Sep 8, 1995 | — |
| 00 | Jun 19, 1995 | Jan 17, 1995 | Yes |
| 00 | Jun 6, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-233-32543 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-233-32543 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23332543, documented in the API reference.