TEXAS · WELLS · HUTCHINSON COUNTY · HERRING LEASE · API 42-233-32741 · DISTRICT 08

Herring #198

Y

Hutchinson County · Panhandle West (Red Cave) field · Producing  · Vertical

Herring #198 (API 42-233-32741) is a well in Hutchinson County operated by Burk Royalty CO. Ltd., completed July 14, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 2, 1997, permitted to 2,399 ft.

It was permitted by Huber, J. M., Corporation and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Completion filings report one formation top, including Red Cave.

Its lease has reported 289 barrels of oil and 96.4K mcf of gas since July 1997, last reporting volume in April 2026.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Huber, J. M., Corporation; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
384
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsBurk Royalty Co., Ltd.through Apr 2026
Latest permitHuber, J. M., CorporationJun 2, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,399
total depth, ft
1
permits on file
Jun 2, 1997
last permit issued
Jul 14, 1997
completed
289
cumulative oil, bbl
96.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 14, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Herring G-14-164765Panhandle, West (Red Cave)Burk Royalty Co., Ltd.128996.4KJul 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 1,584 · prior 12 1,366(+16%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Huber, J. M., CorporationJul 1997 → Apr 2000
  2. 2Stallion Energy LLCJan 2007 → Jun 2007
  3. 3Linn Operating, Inc.Jul 2007 → Apr 2017
  4. 4Linn Operating, LLCMay 2017 → Feb 2018
  5. 5Scout Energy Management LLCMar 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
463107-99DrillHuber, J. M., CorporationMay 30, 1997Jun 2, 1997Jun 8, 19972,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 14, 1997Herring G-14-164765Panhandle West (Red Cave)Burk Royalty Co. Ltd.Producing2,399

Formation tops

As filed on W-2/G-1. Subsea from 3,118 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave1,8781,240

Perforations

Perforated and open-hole intervals.

FromToType
2,0712,087Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62548012.25250 S
5.52,2967.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 22, 1997Aug 7, 1997Yes
00Oct 14, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23332741, documented in the API reference.