TEXAS · WELLS · HUTCHINSON COUNTY · HERRING LEASE · API 42-233-32960 · DISTRICT 08

Herring #C 28R

Shut in

Hutchinson County · Panhandle West (Red Cave) field · Temp Abandoned  · Vertical

Herring #C 28R (API 42-233-32960) is a well in Hutchinson County operated by Burk Royalty CO. Ltd., completed May 19, 2003 and listed as temp abandoned on the RRC schedule, shut in April 1, 2023.

The RRC has issued one drilling permit, issued March 13, 2003, permitted to 2,182 ft.

It was permitted by Huber, J. M., Corporation and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Completion filings report one formation top, including Red Cave.

Its lease has reported 454 barrels of oil and 120K mcf of gas since May 2003, with no volume in the three years through April 2026.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Huber, J. M., Corporation; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
384
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsBurk Royalty Co., Ltd.through Mar 2023
Latest permitHuber, J. M., CorporationMar 13, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,182
total depth, ft
1
permits on file
Mar 13, 2003
last permit issued
May 19, 2003
completed
454
cumulative oil, bbl
120K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Mar 2023

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 19, 2003
Shut in
Apr 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Herring G-14-195690Panhandle, West (Red Cave)Burk Royalty Co., Ltd.1454120KMay 2003 – Mar 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Huber, J. M., CorporationMay 2003 → Oct 2005
  2. 2Stallion Energy LLCNov 2005 → Jun 2007
  3. 3Linn Operating, Inc.Jul 2007 → Apr 2017
  4. 4Linn Operating, LLCMay 2017 → Feb 2018
  5. 5Scout Energy Management LLCMar 2018 → Mar 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
529493-99DrillHuber, J. M., CorporationMar 12, 2003Mar 13, 2003Apr 14, 20032,400

Completions

CompletedLeaseFieldOperatorStatusDepth
May 19, 2003Herring G-14-195690Panhandle West (Red Cave)Burk Royalty Co. Ltd.Temp Abandoned · shut in Apr 1, 20232,182

Formation tops

As filed on W-2/G-1. Subsea from 3,091 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave1,9541,137

Perforations

Perforated and open-hole intervals.

FromToType
1,8692,116Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2040——
8.62548212.25270 S
5.52,1787.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 11, 2003Jun 17, 2003Yes
00Jul 30, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23332960, documented in the API reference.