TEXAS · WELLS · IRION COUNTY · API 42-235-00549 · DISTRICT 6E
Bryant Estate "A" #2
Irion County · Brooks (Canyon 6290) field · Vertical
Bryant Estate "A" #2 (API 42-235-00549) is a plugged well in Irion County, plugged February 24, 1986, last operated by Tucker Drilling Company Inc..
The RRC has issued one drilling permit, issued August 26, 1985, permitted to 6,700 ft.
It was permitted by Txo Production Corp. and has since transferred to Tucker Drilling Company Inc. on the wellbore schedule.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
- Based in
- San Angelo, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 19, 1995
- Permits on file
- 294
- Phone
- (325) 655-6773
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tucker Drilling Company Inc. |
| Production reports | none |
| Latest permit | TXO Production Corp.Aug 26, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,700
- total depth, ft
- 1
- permits on file
- Aug 26, 1985
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 24, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 283388-99 | Other | TXO Production Corp. | Aug 26, 1985 | Aug 26, 1985 | — | 6,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-36967 | Brooks (Canyon 6290) | Tucker Drilling Company Inc. | Plugged | — |
| — | — G-9-18765 | Brooks (Canyon 5900 Gas) | Tucker Drilling Company Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,896 | 5,899 | Perforated |
| 6,103 | 6,105 | Perforated |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-235-00549 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-235-00549 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23500549, documented in the API reference.