WELL · 42-235-32217 · DISTRICT 7
Lindley 40 #16
Irion County · Rock Pen (Canyon) field · Vertical
Lindley 40 #16 (API 42-235-32217) is a plugged well in Irion County, plugged November 27, 2018, last operated by J2 Petroleum LLC.
The RRC has issued one drilling permit, issued January 20, 1984, permitted to 7,250 ft.
It was permitted by Txo Production Corp. and has since transferred to J2 Petroleum LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Wolfcamp, Canyon.
Its lease has reported 58.2K barrels of oil and 693K mcf of gas since January 1993, last reporting in July 2026. The lease carries 16 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
San Angelo, TX · P-5 Y, filed Jul 5, 2019 · (325) 656-5775
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J2 Petroleum LLC |
| Production reports | J2 Petroleum LLCthrough Mar 2015 |
| Latest permit | TXO Production Corp.Jan 20, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,250
- total depth, ft
- 1
- permits on file
- Jan 20, 1984
- last permit issued
- Jul 11, 1984
- completed
- 58.2K
- cumulative oil, bbl
- 693K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 11, 1984
- Shut in
- —
- Plugged
- Nov 27, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 16 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lindley "40" O-9-9727 | Rock Pen (Canyon) | J2 Petroleum LLC | 16 | 58.2K | 693K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyJan 1993 → Jul 1993
- 2Munson Operating, Inc.Aug 1993 → Aug 2014
- 3J2 Petroleum LLCSep 2014 → Feb 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 228241-99 | Drill | TXO Production Corp. | Nov 18, 1983 | Jan 20, 1984 | — | 7,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-9727 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,492 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,833 | 6,882 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 859 | 12.25 | 500 sx |
| 4.5 | 7,010 | 7.875 | 200 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 2, 1984 | Jul 20, 1984 | — |
| 00 | Jul 31, 1984 | Jul 20, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-235-32217 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-235-32217 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23532217, documented in the API reference.