WELL · 42-235-35175 · DISTRICT 7

Sugg Farmar 7A #1

N

Irion County · Sugg Ranch (Canyon) field  · Vertical

Sugg Farmar 7a #1 (API 42-235-35175) is a well in Irion County operated by Compass Energy Operating LLC, completed December 7, 2012.

The RRC has issued 2 drilling permits between 2012 and 2014, permitted to 8,000 ft.

Completion filings report 3 formation tops, including Clear Fork, Wolfcamp, Canyon.

Its 3 leases have reported 20.8K barrels of oil and 131K mcf of gas since December 2012, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Compass Energy Operating LLC

Tulsa, OK · P-5 Y, filed Oct 4, 2025 · 27 permits on file · (325) 277-1754

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCompass Energy Operating LLC
Production reportsCompass Energy Operating, LLCthrough Apr 2026
Latest permitCompass Energy Operating, LLCSep 24, 2014
8,000
total depth, ft
2
permits on file
Sep 24, 2014
last permit issued
Dec 7, 2012
completed
20.8K
cumulative oil, bbl
131K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 7, 2012
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sugg Farmar 7A O-9-21269Spraberry (Trend Area)Compass Energy Operating, LLC12.84K42.8KApr 2021 – Jul 2026
Sugg Farmar '7A' O-9-18740Lonesome Reef (Wolfcamp)Compass Energy Operating, LLC111.5K88.5KNov 2014 – Jul 2021
Sugg Farmar '7A' O-9-18113Sugg Ranch (Canyon)Compass Energy Operating, LLC16.48K0Dec 2012 – Nov 2015

Gas, mcf lease total

Last 12 months 7,033 · prior 12 7,912(-11%)

05001K202420252026

Oil, barrels lease total

Last 12 months 417 · prior 12 521(-20%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exco Resources, Inc.Dec 2012 → Jan 2013
  2. 2Exco/Hgi JV Assets, LLCFeb 2013 → Jun 2014
  3. 3Compass Energy Operating, LLCJul 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
795518-99RecompletionCompass Energy Operating, LLCSep 3, 2014Sep 24, 2014Oct 5, 20147,205
748690-99DrillExco Resources, Inc.Sep 21, 2012Oct 11, 2012Oct 30, 20128,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-18113————
—— O-9-18740————
—— O-9-21269————

Formation tops

As filed on W-2/G-1. Subsea from 2,374 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK2,449-75
Wolfcamp5,558-3,184
Canyon6,716-4,342
Canyon6,746-4,372

Perforations

Perforated and open-hole intervals.

FromToType
6,5536,627Perforated
6,5536,979Perforated
6,8366,979Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00311450 S
4.57,2057.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 2021Sep 21, 2015—
00Nov 2, 2015Sep 21, 2015—
00Jan 30, 2015Dec 1, 2014Yes
00Nov 14, 2013Jan 16, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23535175, documented in the API reference.