WELL · 42-237-04042 · DISTRICT 9

Slusher H #7

N

Jack County · Rusmag (Stray) field  · Vertical

Slusher H #7 (API 42-237-04042) is a well in Jack County operated by Maguire Oil Company, completed August 28, 1988.

The RRC has issued 2 drilling permits between 1988 and 1989, permitted to 5,500 ft.

Completion filings report 13 formation tops, including Caddo, Ken Sand, Smith Sand, Top Of Smith Sand.

No lease production has been reported under this well’s leases.

Operator of record

Maguire Oil Company

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 10, 2006
Permits on file
274
Phone
(214) 741-5137

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMaguire Oil Company
Production reportsCentury Petroleum, Inc.through Apr 2026
Latest permitMaguire Oil CompanyAug 3, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
2
permits on file
Aug 3, 1989
last permit issued
Aug 28, 1988
completed
0
cumulative oil, bbl
141K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 28, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slusher "H" G-13-142032Rusmag (East GC Oil Sand)Century Petroleum, Inc.10141KJan 1993 – Jul 2026
— O-13-27165——000—
— O-13-27556——000—

Gas, mcf lease total

Last 12 months 1,784 · prior 12 2,229(-20%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maguire Oil CompanyJan 1993 → Aug 2004
  2. 23-R Production, Inc.Sep 2004 → Oct 2004
  3. 3EOG Resources, Inc.Nov 2004 → Mar 2009
  4. 4Century Petroleum, Inc.Jun 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
362146-99RecompletionMaguire Oil CompanyJul 31, 1989Aug 3, 1989—5,453
348615-99RecompletionMaguire Oil CompanyJul 7, 1988Jul 11, 1988—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-142032————
—— O-13-27165————
—— O-13-27556————

Formation tops

As filed on W-2/G-1. Subsea from 1,091 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO CONGLOMERATE4,570-3,479
Ken Sand4,899-3,808
Smith Sand4,990-3,899
Top of Smith Sand4,990-3,899
Top Smith Sand4,990-3,899
Base of Smith Sand5,026-3,935
Base Smith Sand5,026-3,935
GC Sand5,244-4,153
Top GC Sand5,244-4,153
Top of GC Sand5,244-4,153
Base GC Sand5,304-4,213
Base of GC Sand5,304-4,213
GC Sand5,304-4,213
Top CMM Sand5,533-4,442

Perforations

Perforated and open-hole intervals.

FromToType
5,2445,250Perforated
5,2525,258Perforated
5,5365,544Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512313.375—
74,5958.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 1992May 29, 1992—
00Aug 26, 1992——
00Dec 1, 1989Oct 20, 1989Yes
00Nov 18, 1989——
00Oct 31, 1988Sep 8, 1988Yes
00Sep 30, 1988——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
160K
bbl, all reported
Oct 1991
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000033804UIC PermitCanceled Mar 17, 1992000–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119901991

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23704042, documented in the API reference.