WELL · 42-237-08368 · DISTRICT 9

Roper #6

N

Jack County · Rusmag (East GC Oil Sand) field  · Vertical

Roper #6 (API 42-237-08368) is a well in Jack County operated by Maguire Oil Company, completed November 10, 1988.

The RRC has issued one drilling permit (amended once), issued May 18, 1988, permitted to 5,750 ft.

Completion filings report 7 formation tops, including Ken Sand, Rusmag (Ken Sand), Rusmag (Smith Sand), Smith Sand.

Its 2 leases have reported 348 barrels of oil and 101K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Maguire Oil Company

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 10, 2006
Permits on file
274
Phone
(214) 741-5137

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMaguire Oil Company
Production reportsCentury Petroleum, Inc.through Apr 2026
Latest permitMaguire Oil CompanyMay 18, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,750
total depth, ft
2
permits on file
May 18, 1988
last permit issued
Nov 10, 1988
completed
348
cumulative oil, bbl
101K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 10, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Roper G-13-148559Rusmag (East GC Oil Sand)Century Petroleum, Inc.1091.5KMar 1994 – Jul 2026
Roper O-13-27242Rusmag (East GC Oil Sand)Maguire Oil Company13489.54KJan 1993 – May 1994

Gas, mcf lease total

Last 12 months 1,115 · prior 12 1,701(-34%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maguire Oil CompanyJan 1993 → Aug 2004
  2. 23-R Production, Inc.Sep 2004 → Oct 2004
  3. 3EOG Resources, Inc.Nov 2004 → Dec 2008
  4. 4Century Petroleum, Inc.Jun 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
346518-98RecompletionMaguire Oil CompanyNov 4, 1988May 18, 1988—5,750
346518-99RecompletionMaguire Oil CompanyMay 13, 1988May 18, 1988—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-148559————
—— O-13-27242————

Formation tops

As filed on W-2/G-1. Subsea from 1,112 ft elevation.Download CSV →

FormationMD ftSubsea
Ken Sand4,884-3,772
Rusmag (Ken Sand)4,884-3,772
Rusmag (Smith Sand)4,989-3,877
Smith Sand4,989-3,877
Base of Smith Sand5,026-3,914
East GC Oil Sand5,266-4,154
Melinda Sand5,529-4,417

Perforations

Perforated and open-hole intervals.

FromToType
5,2665,278Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7512213.7575 S
74,5618.75150 S
4.55,7506.125245 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 18, 1994Mar 14, 1994—
00Mar 31, 1994——
00Jan 16, 1989Dec 9, 1988Yes
00Jan 10, 1989——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23708368, documented in the API reference.