TEXAS · WELLS · JACK COUNTY · API 42-237-32278 · DISTRICT 7C

Nash -C- #1

Y

Jack County · Jack County Regular field · Producing  · Vertical

Nash -C- #1 (API 42-237-32278) is a well in Jack County operated by Texxol Operating Company Inc., completed September 19, 1978 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 25, 1978, permitted to 3,800 ft.

It was permitted by Wes-Mor Drilling, Inc. and has since transferred to Texxol Operating Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Palo Pinto, Shale W/Limy Sand, Shale W/Sand And Lime Stks.

Its 2 leases have reported 7.12K barrels of oil and 224K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Texxol Operating Company Inc.

Permitted by Wes-Mor Drilling, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
May 19, 2026
Permits on file
20
Phone
(817) 246-2455

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTexxol Operating Company, Inc.through Apr 2026
Latest permitWes-Mor Drilling, Inc.May 25, 1978
3,800
total depth, ft
1
permits on file
May 25, 1978
last permit issued
Sep 19, 1978
completed
7.12K
cumulative oil, bbl
224K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 19, 1978
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nash -C- G-13-294608Jack County RegularTexxol Operating Company, Inc.109.73KMar 2023 – Jul 2026
Nash -C- O-13-19038Jack County RegularTexxol Operating Company, Inc.27.12K214KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 2,696 · prior 12 3,212(-16%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wes-Mor Drilling, Inc.Jan 1993 → Oct 1998
  2. 2Richey, Ray Management Co., Inc.Nov 1998 → Jul 2013
  3. 3Texxol Operating Company, Inc.Aug 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
25167-99DrillWes-Mor Drilling, Inc.May 25, 1978May 25, 1978—3,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 19, 1978Nash -C- G-13-294608Jack County RegularTexxol Operating Company Inc.Producing3,800
Sep 7, 1978Nash -C- O-13-19038Jack County RegularTexxol Operating Company Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,102 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO IM588514
Shale W/Limy Sand1,190-88
Shale W/Sand and Lime Stks1,480-378

Perforations

Perforated and open-hole intervals.

FromToType
3,3373,342Open hole
3,3513,355Open hole
3,3893,394Open hole
—3,394Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512112.2590 S
4.53,7947.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 25, 2023Mar 30, 2023—
00Jan 12, 1984Sep 28, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23732278, documented in the API reference.