TEXAS · WELLS · JACK COUNTY · MAXEY LEASE · API 42-237-33931 · DISTRICT 7C

Maxey #13

Plugged

Jack County · Jack County Regular field  · Vertical

Maxey #13 (API 42-237-33931) is a plugged well in Jack County, plugged August 10, 1995, last operated by DM Backhoe Service.

The RRC has issued one drilling permit, issued July 22, 1981, permitted to 1,000 ft.

It was permitted by Rojo Energy CO., Inc. and has since transferred to DM Backhoe Service on the wellbore schedule.

Its lease has reported 60.2K barrels of oil and 136 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 32 wells, so these are lease totals, not this well alone.

Operator of record

DM Backhoe Service

Permitted by Rojo Energy Co., Inc.; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Aug 13, 2025
Phone
(940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDM Backhoe Service
Production reportsDM Backhoe Servicethrough Nov 2013
Latest permitRojo Energy Co., Inc.Jul 22, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
1
permits on file
Jul 22, 1981
last permit issued
Nov 10, 1981
completed
60.2K
cumulative oil, bbl
136
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 10, 1981
Shut in
—
Plugged
Aug 10, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 32 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maxey O-13-21313Jack County RegularDM Backhoe Service3260.2K136Jan 1993 – Nov 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Don Bar Investment CompanyJan 1993 → Feb 2004
  2. 2Beisch, RustyMar 2004 → Nov 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
126606-99DrillRojo Energy Co., Inc.Jul 22, 1981Jul 22, 1981Aug 7, 19811,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 10, 1981Maxey O-13-21313Jack County RegularDM Backhoe ServicePlugged—

Perforations

Perforated and open-hole intervals.

FromToType
498506Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.375505——
4.55256.2575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Dec 3, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

13K
bbl, last 12 reported months
159K
bbl, all reported
Oct 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000043718UIC PermitPlugged Aug 21, 1995000–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 13,039 · prior 12 28,746(-55%)

01K2K3K19941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23733931, documented in the API reference.