TEXAS · WELLS · JACK COUNTY · G-13-99385 LEASE · API 42-237-34333 · DISTRICT 7C

Smith-Cooper Unit #3

Plugged

Jack County · Catlin (Caddo Conglomerate) field  · Vertical

Smith-Cooper Unit #3 (API 42-237-34333) is a plugged well in Jack County, plugged February 6, 1992, last operated by Bridwell Oil CO..

The RRC has issued one drilling permit, issued February 9, 1982, permitted to 6,000 ft.

Operator of record

Bridwell Oil Co.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Jan 7, 2026
Permits on file
1,147
Phone
(940) 723-4351

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBridwell Oil Co.
Production reportsnone
Latest permitBridwell Oil Co.Feb 9, 1982
6,000
total depth, ft
1
permits on file
Feb 9, 1982
last permit issued
Mar 10, 1982
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

On this pageLease production

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 10, 1982
Shut in
—
Plugged
Feb 6, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-13-99385——000—

No volumes reported on these leases in the last three years.

Wells named Smith-Cooper Unit

Bridwell Oil Co.'s other wells filed under this lease name in Jack County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
150269-99DrillBridwell Oil Co.Feb 9, 1982Feb 9, 1982—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 10, 1982Smith-Cooper Unit G-13-99385Catlin (Caddo Conglomerate)Bridwell Oil Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,8215,825Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62537712.25275 S
2.3755,820——
4.55,9498.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Mar 22, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23734333, documented in the API reference.