WELL · 42-237-35860 · DISTRICT 9

Gunter #2

N

Jack County  · Vertical

Gunter #2 (API 42-237-35860) is a permitted well in Jack County filed by Pitcock, Inc.; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1981 and 2000, permitted to 4,950 ft.

Completion filings report 5 formation tops, including Palo Pinto, Capps Lime, Bryson, Caddo.

Its 2 leases have reported 27 barrels of oil and 1.33K mcf of gas since January 1993, last reporting in October 2003. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Pitcock, Inc.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Jul 21, 2025
Permits on file
265
Phone
(940) 549-3344

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPitcock, Inc.through Sep 2002
Latest permitPitcock, Inc.Nov 2, 2000
4,950
total depth, ft
3
permits on file
Nov 2, 2000
last permit issued
—
completed
27
cumulative oil, bbl
1.33K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gunter O-13-29823Jack County RegularPitcock, Inc.127980Sep 2000 – Oct 2003
Gunter G-13-111843Bills (Caddo Conglomerate)Pitcock, Inc.10353Jan 1993 – Sep 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pitcock, Inc.Jan 1993 → Sep 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
501426-99RecompletionPitcock, Inc.Oct 31, 2000Nov 2, 2000Jun 16, 20004,528
230880-99DrillPitcock, Inc.Jul 18, 1984Feb 29, 1984Apr 29, 19844,850
137752-99DrillPitcock, Inc.Oct 23, 1981Oct 23, 1981—4,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-111843————
—— O-13-29823————

Formation tops

As filed on W-2/G-1. Subsea from 1,144 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto865279
Capps Lime1,540-396
BrysonBRYSON SAND2,250-1,106
BrysonBRYSON SAND2,750-1,606
Caddo4,200-3,056
Marble FallsMARBLE FALLS LIME4,775-3,631

Perforations

Perforated and open-hole intervals.

FromToType
3,9323,938Perforated
4,5764,580Perforated
4,7104,714Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522912.25170 sx
4.54,7977.875300 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 2000Oct 9, 2000Yes
00Nov 15, 2000——
00Aug 15, 1984Jul 26, 1984—
00Aug 14, 1984Jul 26, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23735860, documented in the API reference.