TEXAS · WELLS · JACK COUNTY · API 42-237-37424 · DISTRICT 7C
Coker #2
Jack County · Jack County Regular (Gas) field · Vertical
Coker #2 (API 42-237-37424) is a plugged well in Jack County, plugged November 28, 2000, last operated by Cumming Company Inc. The.
The RRC has issued 2 drilling permits between 1987 and 2000, permitted to 5,000 ft.
Completion filings report one formation top, including Strawn.
Its 2 leases have reported 5.56K mcf of gas since April 2000, with no volume in the three years through April 2026.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 410
- Phone
- (817) 737-2393
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cumming Company Inc. The |
| Production reports | Cumming Company, Inc. Thethrough Oct 2000 |
| Latest permit | Cumming Company, Inc. TheMar 31, 2000 |
- 5,000
- total depth, ft
- 2
- permits on file
- Mar 31, 2000
- last permit issued
- Apr 25, 2000
- completed
- 0
- cumulative oil, bbl
- 5.56K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2000 THROUGH Oct 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 25, 2000
- Shut in
- —
- Plugged
- Nov 28, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coker G-13-176991 | Jack County Regular (Gas) | Cumming Company, Inc. The | 1 | 0 | 5.56K | Apr 2000 – Oct 2000 |
| — G-13-127790 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cumming Company, Inc. TheMay 2000 → Oct 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 493630-99 | Reenter | Cumming Company, Inc. The | Mar 30, 2000 | Mar 31, 2000 | Apr 1, 2000 | 5,000 |
| 337888-99 | Drill | Threadgill, Dowdey Prod. Co. | Oct 26, 1987 | Oct 26, 1987 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 25, 2000 | Coker G-13-176991 | Jack County Regular (Gas) | Cumming Company Inc. The | Plugged | — |
| Apr 25, 1988 | Coker C. J. G-13-127790 | Jack County Regular (Gas) | Threadgill Dowdey Prod. Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,042 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,914 | 2,918 | Perforated |
| 4,874 | 4,879 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 678 | 12.25 | 430 S |
| 4.5 | 3,098 | 7.875 | 120 S |
| 4.5 | 4,910 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 26, 2000 | May 15, 2000 | Yes |
| 00 | Jun 2, 2000 | — | — |
| 00 | Sep 7, 1988 | May 18, 1988 | Yes |
| 00 | Aug 12, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-37424 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-37424 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23737424, documented in the API reference.