WELL · 42-237-37594 · DISTRICT 9

Maxey #6

Plugged

Jack County · Jack County Regular field  · Vertical

Maxey #6 (API 42-237-37594) is a plugged well in Jack County, plugged October 17, 2012, last operated by DM Backhoe Service.

The RRC has issued one drilling permit, issued February 3, 1989, permitted to 650 ft.

It was permitted by Don Bar Investment Company and has since transferred to DM Backhoe Service on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 60.2K barrels of oil and 136 mcf of gas since January 1993, last reporting in August 2025. The lease carries 32 wells, so these are lease totals, not this well alone.

Operator of record

DM Backhoe Service

Permitted by Don Bar Investment Company; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Aug 13, 2025
Phone
(940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDM Backhoe Service
Production reportsBeisch, Rustythrough Nov 2013
Latest permitDon Bar Investment CompanyFeb 3, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

650
total depth, ft
1
permits on file
Feb 3, 1989
last permit issued
Sep 17, 2007
completed
60.2K
cumulative oil, bbl
136
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 17, 2007
Shut in
—
Plugged
Oct 17, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 32 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maxey O-13-21313Jack County RegularDM Backhoe Service3260.2K136Jan 1993 – Aug 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Don Bar Investment CompanyJan 1993 → Feb 2004
  2. 2Beisch, RustyMar 2004 → Nov 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
355766-99DrillDon Bar Investment CompanyFeb 2, 1989Feb 3, 1989—650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-21313————

Formation tops

As filed on W-2/G-1. Subsea from 1,156 ft elevation.Download CSV →

FormationMD ftSubsea
GunsightGUNSIGHT OIL SAND490666

Perforations

Perforated and open-hole intervals.

FromToType
493498Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.55306.7570 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 2010Apr 19, 2010—
00Sep 19, 2007Aug 3, 2007—
00Dec 12, 1994Nov 17, 1994—
00May 5, 1989Apr 10, 1989Yes
00May 3, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
219K
bbl, all reported
Oct 2007
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082244H-1 InjectionPlugged Nov 26, 2012150225493–498

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 3,650(-100%)

020040020062007

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23737594, documented in the API reference.