TEXAS · WELLS · JACK COUNTY · MUSTANG LEASE · API 42-237-37675 · DISTRICT 7C
Mustang #1
Jack County · Maryetta SE. (Congl) field · Vertical
- Fields on the latest permit · any of 8
- Boonsville (Bend Congl., Gas) · Cundiff, North (5700) · Douglas (Atoka) · Jack County Regular · Field 47726900 · Maryetta, SE. (Congl) · Tipton (Atoka Congl.) · Weiler (Marble Falls)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Mustang #1 (API 42-237-37675) is a plugged well in Jack County, plugged June 25, 1998, last operated by Cholla Petroleum Inc..
The RRC has issued one drilling permit, issued October 20, 1989, permitted to 5,900 ft.
Its lease has reported 2.55K barrels of oil and 37.2K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 23, 2026
- Permits on file
- 1,085
- Phone
- (214) 692-7052
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cholla Petroleum Inc. |
| Production reports | Cholla Petroleum, Inc.through Jun 1998 |
| Latest permit | Cholla Petroleum, Inc.Oct 20, 1989 |
- 5,900
- total depth, ft
- 1
- permits on file
- Oct 20, 1989
- last permit issued
- Jan 19, 1990
- completed
- 2.55K
- cumulative oil, bbl
- 37.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 19, 1990
- Shut in
- —
- Plugged
- Jun 25, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mustang O-13-27638 | Maryetta, SE. (Congl) | Cholla Petroleum, Inc. | 1 | 2.55K | 37.2K | Jan 1993 – Jun 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cholla Petroleum, Inc.Jan 1993 → May 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 365279-99 | Drill | Cholla Petroleum, Inc. | Oct 18, 1989 | Oct 20, 1989 | — | 5,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 19, 1990 | Mustang O-13-27638 | Maryetta SE. (Congl) | Cholla Petroleum Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,464 | 5,470 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 440 | 12.25 | 310 S |
| 4.5 | 5,770 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 1990 | Feb 13, 1990 | Yes |
| 00 | Mar 14, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-37675 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-37675 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23737675, documented in the API reference.