TEXAS · WELLS · JACK COUNTY · MARTIN, J. B. "A" LEASE · API 42-237-38340 · DISTRICT 7C

Martin J. B. A #1

Y

Jack County · Lost Valley (Caddo) field · Producing  · Horizontal

Martin J. B. A #1 (API 42-237-38340) is a horizontal well in Jack County operated by Great American Resources Inc., completed March 20, 1998 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 12, 1997, permitted to 6,283 ft.

It was permitted by Mitchell Energy Corporation and has since transferred to Great American Resources Inc. on the wellbore schedule.

Completion filings report one formation top, including Caddo.

Its lease has reported 80.7K barrels of oil and 207K mcf of gas since March 1998, last reporting in July 2026.

Operator of record

Great American Resources Inc.

Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.

Based in
Bowie, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 23, 2026
Permits on file
8
Phone
(940) 894-2014

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJay Management Company LLC
Production reportsJay Management Company, LLCthrough Apr 2026
Latest permitMitchell Energy CorporationDec 12, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,283
total depth, ft
1
permits on file
Dec 12, 1997
last permit issued
Mar 20, 1998
completed
80.7K
cumulative oil, bbl
207K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 20, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Martin, J. B. "A" O-13-29515Lost Valley (Caddo)Jay Management Company, LLC180.7K207KMar 1998 – Jul 2026

Oil, barrels lease total

Last 12 months 508 · prior 12 551(-8%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy CorporationMar 1998 → Dec 2000
  2. 2Mitchell Energy Company L.P.Jan 2001 → Mar 2002
  3. 3Devon Energy Operating Co., L.P.Apr 2002 → Oct 2002
  4. 4Moriah Resources, Inc.Nov 2002 → Apr 2004
  5. 5Aspen Operating Company, L.L.C.May 2004 → Jan 2008
  6. 6Jay Management Company, LLCFeb 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
471161-99DrillMitchell Energy CorporationDec 12, 1997Dec 12, 1997Feb 18, 19984,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 20, 1998Martin J. B. A O-13-29515Lost Valley (Caddo)Great American Resources Inc.Producing6,283

Formation tops

As filed on W-2/G-1. Subsea from 1,207 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,767-3,560

Perforations

Perforated and open-hole intervals.

FromToType
5,0906,283Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62536614.75350 S
75,0918.75400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 1, 1998Apr 9, 1998Yes
00Jun 15, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23738340, documented in the API reference.