WELL · 42-237-38373 · DISTRICT 9
Boley #1
Jack County · Shawver (Strawn 2600) field · Vertical
Boley #1 (API 42-237-38373) is a plugged well in Jack County, plugged November 14, 2007, last operated by Cumming Company Inc. The.
The RRC has issued 2 drilling permits (amended once) between 1998 and 2006, permitted to 6,200 ft.
Completion filings report 4 formation tops, including Strawn, 4390, Caddo, Prognant Shale.
Its 2 leases have reported 7.92K barrels of oil and 142K mcf of gas since May 1998, last reporting in April 2008. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 410
- Phone
- (817) 737-2393
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cumming Company Inc. The |
| Production reports | Cumming Company, Inc. Thethrough Sep 2007 |
| Latest permit | Cumming Company, Inc. TheMar 23, 2006 |
- 6,200
- total depth, ft
- 3
- permits on file
- Mar 23, 2006
- last permit issued
- Mar 3, 2006
- completed
- 7.92K
- cumulative oil, bbl
- 142K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1998 THROUGH Apr 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 3, 2006
- Shut in
- —
- Plugged
- Nov 14, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Boley O-13-29502 | Gage (Conglomerate) | Cumming Company, Inc. The | 1 | 7.92K | 122K | May 1998 – Apr 2008 |
| Boley G-13-219793 | Shawver (Strawn 2600) | Cumming Company, Inc. The | 1 | 0 | 19.9K | Mar 2006 – Nov 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cumming Company, Inc. TheMay 1998 → Sep 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 615738-99 | Recompletion | Cumming Company, Inc. The | Mar 13, 2006 | Mar 23, 2006 | Feb 25, 2006 | 5,524 |
| 474867-98 | Drill | Cumming Company, Inc. The | May 15, 1998 | Apr 1, 1998 | Apr 8, 1998 | 6,200 |
| 474867-99 | Drill | Cumming Company, Inc. The | Mar 31, 1998 | Apr 1, 1998 | — | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-219793 | — | — | — | — |
| — | — O-13-29502 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,171 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,837 | 2,878 | Perforated |
| 5,446 | 5,452 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 325 | 12.25 | 190 S |
| 8.625 | 325 | 12.5 | 190 S |
| 4.5 | 5,520 | 7.875 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 21, 2007 | Aug 31, 2006 | — |
| 00 | Oct 5, 2006 | — | — |
| 00 | Jun 10, 1998 | May 15, 1998 | Yes |
| 00 | May 26, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-38373 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-38373 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23738373, documented in the API reference.