WELL · 42-237-38424 · DISTRICT 9
Boley #3
Jack County · Boonsville (Caddo 4120) field · Shut IN · Vertical
Boley #3 (API 42-237-38424) is a well in Jack County operated by Arrowhead Productions LP, completed February 5, 2003 and listed as shut in on the RRC schedule, shut in October 1, 2003.
The RRC has issued 2 drilling permits between 1998 and 2002, permitted to 5,554 ft.
It was permitted by Cumming Company, Inc. The and has since transferred to Arrowhead Productions LP on the wellbore schedule.
Completion filings report 3 formation tops, including Strawn, Caddo, Conglomerate.
Its lease has reported 135 barrels of oil and 2.5K mcf of gas since March 2003, last reporting in July 2026.
Operator of record
Permitted by Cumming Company, Inc. The; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Nov 8, 2023
- Permits on file
- 17
- Phone
- (817) 882-8827
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cumming Company, Inc. Thethrough Aug 2003 |
| Latest permit | Cumming Company, Inc. TheMay 15, 2002 |
- 5,554
- total depth, ft
- 2
- permits on file
- May 15, 2002
- last permit issued
- Feb 5, 2003
- completed
- 135
- cumulative oil, bbl
- 2.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 5, 2003
- Shut in
- Oct 1, 2003
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Boley O-13-30160 | Boonsville (Caddo 4120) | Arrowhead Productions, LP | 1 | 135 | 2.5K | Mar 2003 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cumming Company, Inc. TheMar 2003 → Aug 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 519907-99 | Reenter | Cumming Company, Inc. The | May 10, 2002 | May 15, 2002 | Nov 20, 2002 | 6,200 |
| 479358-99 | Drill | Cumming Company, Inc. The | Sep 10, 1998 | Sep 11, 1998 | Sep 22, 1998 | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 5, 2003 | Boley O-13-30160 | Boonsville (Caddo 4120) | Arrowhead Productions LP | Shut IN · shut in Oct 1, 2003 | 5,554 |
Formation tops
As filed on W-2/G-1. Subsea from 1,160 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,400 | 4,414 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 326 | 12.25 | 190 S |
| 4.5 | 5,371 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 29, 2003 | Mar 27, 2003 | Yes |
| 00 | Jul 25, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-38424 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-38424 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23738424, documented in the API reference.