WELL · 42-237-38842 · DISTRICT 9
PMC #1
Jack County · Newark East (Barnett Shale) field · Vertical
Pmc #1 (API 42-237-38842) is a well in Jack County operated by Upham Oil & Gas Company, completed September 15, 2005.
The RRC has issued 2 drilling permits between 2005 and 2015, permitted to 6,500 ft.
Completion filings report 14 formation tops, including Palo Pinto, Strawn, Caddo, Atoka.
Its 3 leases have reported 270 barrels of oil and 154K mcf of gas since September 2005, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Mineral Wells, TX · P-5 Y, filed Sep 4, 2025 · 141 permits on file · (940) 325-4491
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Upham Oil & Gas Company |
| Production reports | Upham Oil & Gas Companythrough Apr 2026 |
| Latest permit | Upham Oil & Gas CompanyMar 12, 2015 |
- 6,500
- total depth, ft
- 2
- permits on file
- Mar 12, 2015
- last permit issued
- Sep 15, 2005
- completed
- 270
- cumulative oil, bbl
- 154K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 15, 2005
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| PMC G-13-286672 | Morris (Consolidated Congl.) | Upham Oil & Gas Company | 1 | 0 | 54.8K | Mar 2019 – Jul 2026 |
| PMC O-13-33493 | Morris (Consolidated Congl.) | Upham Oil & Gas Company | 1 | 270 | 49.2K | Jan 2015 – Jul 2026 |
| PMC G-13-213716 | Newark, East (Barnett Shale) | Upham Oil & Gas Company | 1 | 0 | 50.4K | Sep 2005 – Jan 2017 |
Gas, mcf lease total
Last 12 months 4,513 · prior 12 4,390(+3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Upham Oil & Gas CompanySep 2005 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 804409-99 | Recompletion | Upham Oil & Gas Company | Mar 6, 2015 | Mar 12, 2015 | Feb 18, 2015 | 5,750 |
| 556628-99 | Drill | Upham Oil & Gas Company | Jan 24, 2005 | Jan 24, 2005 | Feb 7, 2005 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-213716 | — | — | — | — |
| — | — G-13-286672 | — | — | — | — |
| — | — O-13-33493 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,202 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 1,240 | -38 |
| Strawn | 3,590 | -2,388 |
| Caddo | 4,352 | -3,150 |
| Caddo | 4,414 | -3,212 |
| AtokaATOKA CONGLOMERATE | 4,695 | -3,493 |
| BendBEND CONGLOMERATE | 4,940 | -3,738 |
| Marble Falls | 5,396 | -4,194 |
| BarnettBARNETT SHALE | 5,780 | -4,578 |
| Ellenburger | 6,018 | -4,816 |
| Bryson | — | — |
| Butram | — | — |
| CanyonCANYON SAND | — | — |
| Gunsight | — | — |
| Palo Pinto | — | — |
| Strawn | — | — |
| Village Bend | — | — |
| Weir | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,025 | 5,029 | Perforated |
| 5,802 | 5,917 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 339 | 12.25 | 225 S |
| 5.5 | 6,162 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 28, 2019 | Mar 26, 2019 | Yes |
| 00 | May 12, 2016 | May 11, 2015 | — |
| 00 | May 16, 2006 | Dec 30, 2005 | Yes |
| 00 | Feb 6, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-38842 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-38842 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23738842, documented in the API reference.