TEXAS · WELLS · JACK COUNTY · API 42-237-38938 · DISTRICT 7C
Shawver #1H
Jack County · Newark East (Barnett Shale) field · Temp Abandoned · Horizontal
Shawver #1H (API 42-237-38938) is a horizontal well in Jack County operated by Arrowhead Productions LP, completed July 4, 2006 and listed as temp abandoned on the RRC schedule, shut in February 1, 2015.
The RRC has issued one drilling permit (amended once), issued April 10, 2006, permitted to 5,905 ft.
It was permitted by Eog Resources, Inc. and has since transferred to Arrowhead Productions LP on the wellbore schedule.
Completion filings report 6 formation tops, including Strawn, Atoka, Bend, Hood.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Nov 8, 2023
- Permits on file
- 17
- Phone
- (817) 882-8827
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Jan 2015 |
| Latest permit | EOG Resources, Inc.Apr 10, 2006 |
- 5,905
- total depth, ft
- 2
- permits on file
- Apr 10, 2006
- last permit issued
- Jul 4, 2006
- completed
- 0
- cumulative oil, bbl
- 294K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 4, 2006
- Shut in
- Feb 1, 2015
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Shawver G-13-230484 | Newark, East (Barnett Shale) | Arrowhead Productions, LP | 1 | 0 | 294K | Jun 2006 – Jul 2026 |
| Shawver Unit G-13-230483 | Newark, East (Barnett Shale) | EOG Resources, Inc. | 1 | 0 | 0 | Jun 2006 – Jan 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Jul 2006 → Jan 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 617266-98 | Drill | EOG Resources, Inc. | May 16, 2006 | Apr 10, 2006 | May 21, 2006 | 6,200 |
| 617266-99 | Drill | EOG Resources, Inc. | Apr 10, 2006 | Apr 10, 2006 | — | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 4, 2006 | Shawver G-13-230484 | Newark East (Barnett Shale) | Arrowhead Productions LP | Temp Abandoned · shut in Feb 1, 2015 | 5,905 |
| — | Shawver Unit G-13-230483 | Newark East (Barnett Shale) | EOG Resources Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,096 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,198 | 6,358 | Perforated |
| 6,198 | 8,808 | Perforated |
| 6,548 | 6,708 | Perforated |
| 6,898 | 7,058 | Perforated |
| 7,248 | 7,408 | Perforated |
| 7,598 | 7,758 | Perforated |
| 7,948 | 8,108 | Perforated |
| 8,298 | 8,458 | Perforated |
| 8,648 | 8,808 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 835 | 12.25 | 320 S |
| 4.5 | 9,675 | 7.875 | 990 S |
| 4.5 | 9,675 | 8.75 | 990 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 17, 2015 | Jun 23, 2015 | — |
| 00 | Nov 8, 2007 | Sep 7, 2006 | Yes |
| 00 | Oct 31, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-38938 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-38938 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23738938, documented in the API reference.