TEXAS · WELLS · JACK COUNTY · JACKSON HEIRS LEASE · API 42-237-38981 · DISTRICT 7C

Jackson Heirs #1H

Shut in

Jack County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Jackson Heirs #1H (API 42-237-38981) is a horizontal well in Jack County operated by Arrowhead Productions LP, completed December 17, 2006 and listed as temp abandoned on the RRC schedule, shut in February 1, 2017.

The RRC has issued one drilling permit, issued September 25, 2006, permitted to 6,086 ft.

It was permitted by Eog Resources, Inc. and has since transferred to Arrowhead Productions LP on the wellbore schedule.

Completion filings report 6 formation tops, including Strawn, Atoka, Bend, Hood.

Its lease has reported 9.78K barrels of oil and 819K mcf of gas since December 2006, with no volume in the three years through April 2026.

Operator of record

Arrowhead Productions LP

Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Delinquent (D)
P-5 last filed
Nov 8, 2023
Permits on file
17
Phone
(817) 882-8827

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArrowhead Productions LP
Production reportsArrowhead Productions, LPthrough Jul 2019
Latest permitEOG Resources, Inc.Sep 25, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,086
total depth, ft
1
permits on file
Sep 25, 2006
last permit issued
Dec 17, 2006
completed
9.78K
cumulative oil, bbl
819K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jul 2019

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 17, 2006
Shut in
Feb 1, 2017
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jackson Heirs G-13-236886Newark, East (Barnett Shale)Arrowhead Productions, LP19.78K819KDec 2006 – Jul 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Dec 2006 → Jan 2017
  2. 2Arrowhead Productions, LPApr 2018 → Jul 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
626035-99DrillEOG Resources, Inc.Sep 15, 2006Sep 25, 2006Sep 27, 20066,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 17, 2006Jackson Heirs G-13-236886Newark East (Barnett Shale)Arrowhead Productions LPTemp Abandoned · shut in Feb 1, 20176,086

Formation tops

As filed on W-2/G-1. Subsea from 996 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn3,601-2,605
Atoka4,363-3,367
BendBEND CONGL4,933-3,937
BendBEND CONGL.4,933-3,937
Hood5,276-4,280
Marble Falls5,568-4,572
BarnettBARNETT SHALE5,895-4,899

Perforations

Perforated and open-hole intervals.

FromToType
6,3609,680Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62573812.25300 S
4.59,6876.5675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 5, 2014Oct 23, 2014—
00Jul 28, 2008Mar 7, 2007Yes
00Jul 23, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23738981, documented in the API reference.