WELL · 42-237-39129 · DISTRICT 9
Clayton Ranch #1
Jack County · Perrin SW (Congl 4850) field · Vertical
Clayton Ranch #1 (API 42-237-39129) is a plugged well in Jack County, plugged November 20, 2009, last operated by Cumming Company Inc. The.
The RRC has issued one drilling permit (amended once), issued July 14, 2007, permitted to 6,000 ft.
Completion filings report 3 formation tops, including Strawn, Conglomerate, Marble Falls.
Its lease has reported 2.41K barrels of oil and 8.19K mcf of gas since September 2007, last reporting in January 2010.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 410
- Phone
- (817) 737-2393
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cumming Company Inc. The |
| Production reports | Cumming Company, Inc. Thethrough Aug 2009 |
| Latest permit | Cumming Company, Inc. TheJul 14, 2007 |
- 6,000
- total depth, ft
- 2
- permits on file
- Jul 14, 2007
- last permit issued
- Sep 24, 2007
- completed
- 2.41K
- cumulative oil, bbl
- 8.19K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2007 THROUGH Jan 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 24, 2007
- Shut in
- —
- Plugged
- Nov 20, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clayton Ranch O-13-30855 | Perrin, SW (Congl 4850) | Cumming Company, Inc. The | 1 | 2.41K | 8.19K | Sep 2007 – Jan 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cumming Company, Inc. TheSep 2007 → Apr 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 641867-98 | Drill | Cumming Company, Inc. The | Jul 27, 2007 | Jul 14, 2007 | Jul 19, 2007 | 6,000 |
| 641867-99 | Drill | Cumming Company, Inc. The | Jul 3, 2007 | Jul 14, 2007 | Jul 19, 2007 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30855 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,056 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnUPPER STRAWN | 2,595 | -1,539 |
| StrawnLOWER STRAWN | 3,320 | -2,264 |
| Conglomerate | 4,342 | -3,286 |
| Marble Falls | 4,713 | -3,657 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,713 | 4,788 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 319 | 12.25 | 190 S |
| 4.5 | 4,990 | 7.875 | 205 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 30, 2007 | Sep 27, 2007 | Yes |
| 00 | Oct 26, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-39129 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-39129 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23739129, documented in the API reference.