TEXAS · WELLS · JACK COUNTY · API 42-237-39539 · DISTRICT 09

Pinnington Creek SWD #1

WaterN

Jack County  · Vertical

Pinnington Creek Swd #1 (API 42-237-39539) is a former disposal or injection well in Jack County, last operated by Cobra Oil & Gas Corporation; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued April 2, 2012, permitted to 8,000 ft.

Operator of record

Cobra Oil & Gas Corporation

Based in
Wichita Falls, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 18, 2026
Permits on file
778
Phone
(940) 716-5100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCobra Oil & Gas CorporationApr 2, 2012
8,000
total depth, ft
1
permits on file
Apr 2, 2012
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
736426-99DrillCobra Oil & Gas CorporationMar 20, 2012Apr 2, 2012—8,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000106139W-14 DisposalCanceled Apr 4, 201625,0002,4504,900–7,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23739539, documented in the API reference.