WELL · 42-237-40240 · DISTRICT 9
S. Peavy #4
Jack County · Newark East (Barnett Shale) field · Vertical
S. Peavy #4 (API 42-237-40240) is a well in Jack County operated by Jdl Operating LLC, completed June 9, 2015.
The RRC has issued one drilling permit, issued September 24, 2014, permitted to 6,000 ft.
Completion filings report 12 formation tops, including Palo Pinto, Strawn, Bryson, Caddo.
Its 2 leases have reported 30.1K barrels of oil and 31.1K mcf of gas since June 2015, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Holliday, TX · P-5 Y, filed Nov 4, 2025 · 48 permits on file · (940) 691-1344
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | JDL Operating LLC |
| Production reports | JDL Operating, LLCthrough Apr 2026 |
| Latest permit | JDL Operating, LLCSep 24, 2014 |
- 6,000
- total depth, ft
- 1
- permits on file
- Sep 24, 2014
- last permit issued
- Jun 9, 2015
- completed
- 30.1K
- cumulative oil, bbl
- 31.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 9, 2015
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| S. Peavy O-13-33702 | Bryson (Mississippi Lime) | JDL Operating, LLC | 1 | 30.1K | 31.1K | Feb 2016 – Jul 2026 |
| S. Peavy O-13-33507 | Newark, East (Barnett Shale) | JDL Operating, LLC | 1 | 0 | 0 | Jun 2015 – Dec 2021 |
Oil, barrels lease total
Last 12 months 2,440 · prior 12 2,478(-2%)
Gas, mcf lease total
Last 12 months 2,437 · prior 12 2,744(-11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1JDL Operating, LLCFeb 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 794809-99 | Drill | JDL Operating, LLC | Aug 25, 2014 | Sep 24, 2014 | Sep 24, 2014 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-33507 | — | — | — | — |
| — | — O-13-33702 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Palo Pinto | 1,300 |
| Strawn | 3,400 |
| Bryson | 4,100 |
| Caddo | 4,495 |
| Caddo | 4,500 |
| Marble Falls | 4,954 |
| BarnettBARNETT SHALE | 5,278 |
| AtokaATOKA CONGLOMERATE | — |
| Butram | — |
| CanyonCANYON SAND | — |
| Gunsight | — |
| Palo Pinto | — |
| Village Bend | — |
| Weir | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,299 | 5,306 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 12.25 | 305 | 8.625 | 210 S |
| 8.625 | 305 | 12.25 | 210 S |
| 8.625 | 305 | 12.5 | 210 S |
| 7.875 | 5,316 | 5.5 | 350 S |
| 5.5 | 5,316 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 25, 2018 | Jun 13, 2018 | — |
| 00 | May 9, 2018 | Feb 21, 2018 | Yes |
| 00 | May 25, 2016 | Apr 11, 2016 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-40240 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-40240 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23740240, documented in the API reference.