WELL · 42-237-40462 · DISTRICT 9

Williams #5

Y

Jack County · Jack County Regular field · Injection  · Vertical

Williams #5 (API 42-237-40462) is a well in Jack County operated by Rio Bravo Production LLC, completed February 1, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued February 24, 2017, permitted to 300 ft.

It was permitted by Stamper Operating CO., Inc. and has since transferred to Rio Bravo Production LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Gunsight, Atoka, Bryson, Butram.

Its lease has reported 7.18K barrels of oil since December 2014, last reporting in July 2026. The lease carries 9 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 18.3K barrels injected in the 12 months reported through October 2025.

Operator of record

Rio Bravo Production LLC

Permitted by Stamper Operating Co., Inc.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Jul 4, 2026 · 3 permits on file · (940) 781-0078

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRio Bravo Production LLC
Production reportsRio Bravo Production, LLCthrough Apr 2026
Latest permitStamper Operating Co., Inc.Feb 24, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

300
total depth, ft
1
permits on file
Feb 24, 2017
last permit issued
Feb 1, 2022
completed
7.18K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 1, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Williams O-13-33599Jack County RegularRio Bravo Production, LLC97.18K0Dec 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 158 · prior 12 232(-32%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stamper Operating Co., Inc.Jan 2015 → Dec 2023
  2. 2Rio Bravo Production, LLCJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
822978-99DrillStamper Operating Co., Inc.Feb 7, 2017Feb 24, 2017Mar 10, 2017300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-33599————

Formation tops

As filed on W-2/G-1. Subsea from 1,074 ft elevation.Download CSV →

FormationMD ftSubsea
Gunsight265809
Gunsight268806
AtokaATOKA CONGLOMERATE——
Bryson——
Butram——
Caddo——
CanyonCANYON SAND——
Palo Pinto——
Strawn——
Village Bend——
Weir——

Perforations

Perforated and open-hole intervals.

FromToType
265268Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.52657.87590 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 17, 2022Mar 3, 2022—
00Nov 14, 2017May 22, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

18.3K
bbl, last 12 reported months
26.1K
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000124601H-1 InjectionActive100130265–268

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 18,259 · prior 12 0

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23740462, documented in the API reference.