WELL · 42-237-40579 · DISTRICT 9

Rock Pile #1

Plugged

Jack County · Jack County Regular field  · Vertical

Rock Pile #1 (API 42-237-40579) is a plugged well in Jack County, plugged November 17, 2022, last operated by Borderline Operating Corp..

The RRC has issued one drilling permit, issued April 19, 2021, permitted to 4,999 ft.

It was permitted by B.O.L.D. Oil And Gas, LLC and has since transferred to Borderline Operating Corp. on the wellbore schedule.

Completion filings report 10 formation tops, including Atoka, Bryson, Butram, Caddo.

Its lease has reported 5.55K barrels of oil and 5.19K mcf of gas since June 2021, last reporting in February 2023.

Operator of record

Borderline Operating Corp.

Permitted by B.O.L.D. Oil and Gas, LLC; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Dec 4, 2025 · 98 permits on file · (940) 550-4900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBorderline Operating Corp.
Production reportsB.O.L.D. Oil and Gas, LLCthrough Aug 2022
Latest permitB.O.L.D. Oil and Gas, LLCApr 19, 2021

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
1
permits on file
Apr 19, 2021
last permit issued
Jun 15, 2021
completed
5.55K
cumulative oil, bbl
5.19K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2021 THROUGH Feb 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 15, 2021
Shut in
—
Plugged
Nov 17, 2022

Surface location

33.018042, -98.417608

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Jack County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rock Pile O-13-34045Jack County RegularBorderline Operating Corp.15.55K5.19KJun 2021 – Feb 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1B.O.L.D. Oil and Gas, LLCAug 2021 → Aug 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
868841-99DrillB.O.L.D. Oil and Gas, LLCApr 3, 2021Apr 19, 2021—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-34045————

Formation tops

As filed on W-2/G-1. Subsea from 1,095 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA CONGLOMERATE——
Bryson——
Butram——
Caddo——
CanyonCANYON SAND——
Gunsight——
Palo Pinto——
Strawn——
Village Bend——
Weir——

Perforations

Perforated and open-hole intervals.

FromToType
4,5464,552Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522012.25150 S
5.54,5417.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 2021Sep 3, 2021Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Leach Pit42-237-40576

0.8 KM · B.O.L.D. Oil and Gas, LLC · Section with this well →

Strawn1,788-777
Caddo3,790-2,779
Bryson—
Village Bend—
Palo Pinto—
Gunsight—
Canyon—
Butram—

10 TOPS · FIRST 8

1191 Unit42-237-40596

0.9 KM · B.O.L.D. Oil and Gas, LLC · Section with this well →

Caddo3,600-2,510
Palo Pinto—
Weir—
Village Bend—
Atoka—
Bryson—
Butram—
Canyon—

10 TOPS · FIRST 8

McNeill42-503-42378

3.2 KM · Beren Corporation · Section with this well →

Gunsight774349
Cisco799324
Palo Pinto1,206-83
Buttram1,719-596
Herron City1,829-706
Canyon2,227-1,104
Strawn2,433-1,310
Bryson3,108-1,985

10 TOPS · FIRST 8

Ross Mountain42-237-37134

4.9 KM · Western Chief Oil & Gas Company · Section with this well →

Palo Pinto898300
Palo Pinto930268
Weir1,720-522
Weir Sand1,720-522
Buttram1,870-672
Buttram Sand1,870-672
Strawn2,270-1,072
Bryson3,110-1,912

12 TOPS · FIRST 8

House42-237-40616

5.5 KM · Clear Brooke Ranches, LLC · Section with this well →

Butram1,900-659
Bryson3,050-1,809
Caddo4,229-2,988
Atoka4,382-3,141
Mississippian4,878-3,637
Village Bend—
Canyon—
Gunsight—

11 TOPS · FIRST 8

Moren Deep42-503-42561

6.4 KM · B.O.L.D. Oil and Gas, LLC · Section with this well →

Herron City2,364-1,304
Atoka—
Caddo—
Buttram—
Bryson—
Strawn—
Palo Pinto—
Cisco—

10 TOPS · FIRST 8

Halsell Ranch42-363-36341

6.9 KM · Petrobal Omega 1, LLC · Section with this well →

Buttram Sand - Disposal1,982-710
Strawn2,056-784
Caddo3,904-2,632
Atoka4,259-2,987
Caddo—
Unidentified-County Regular (Gas—
Palo Pinto—
Gunsight—

10 TOPS · FIRST 8

Halsell Ranch42-363-36347

7.3 KM · Petrobal Omega 1, LLC · Section with this well →

Buttram Sand - Disposal1,987-708
Strawn2,102-823
Caddo3,880-2,601
Atoka4,234-2,955
Marble Falls4,539-3,260
Gunsight—
Canyon—
Caddo—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23740579, documented in the API reference.