WELL · 42-237-40606 · DISTRICT 9
Johnson #1
Jack County · AL-Vinc (Caddo) field · Producing · Vertical
Johnson #1 (API 42-237-40606) is a well in Jack County operated by Caribou Operating Inc., completed September 7, 2022 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued May 5, 2022, permitted to 6,500 ft.
Completion filings report 10 formation tops, including Caddo, Atoka, Bryson, Butram.
Its lease has reported 5.3K barrels of oil and 2.29K mcf of gas since September 2022, last reporting in July 2026.
Operator of record
Granbury, TX · P-5 Y, filed Feb 4, 2026 · 29 permits on file · (817) 573-8663
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Caribou Operating Inc. |
| Production reports | Caribou Operating, Inc.through Feb 2026 |
| Latest permit | Caribou Operating, Inc.May 5, 2022 |
- 6,500
- total depth, ft
- 2
- permits on file
- May 5, 2022
- last permit issued
- Sep 7, 2022
- completed
- 5.3K
- cumulative oil, bbl
- 2.29K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2022 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 7, 2022
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
33.401046, -98.269544
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Jack County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson O-13-34126 | AL-Vinc (Caddo) | Caribou Operating, Inc. | 1 | 5.3K | 2.29K | Sep 2022 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Oil, barrels lease total
Last 12 months 6 · prior 12 15(-60%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Caribou Operating, Inc.Sep 2022 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 879478-98 | Drill | Caribou Operating, Inc. | Sep 12, 2022 | May 5, 2022 | Jun 12, 2022 | 6,500 |
| 879478-99 | Drill | Caribou Operating, Inc. | Apr 26, 2022 | May 5, 2022 | Jun 12, 2022 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-34126 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 950 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,030 | 5,032 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 405 | 12.25 | 250 S |
| 5.5 | 6,110 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 30, 2022 | Sep 19, 2022 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-40606 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-40606 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Johnson42-237-40632
0.4 KM · Caribou Operating, Inc. · Section with this well →
| Caddo | 5,000 | -4,040 |
| Weir | — | |
| Village Bend | — | |
| Strawn | — | |
| Palo Pinto | — | |
| Gunsight | — | |
| Canyon | — | |
| Bryson | — |
10 TOPS · FIRST 8
Johnson42-237-40636
0.4 KM · Caribou Operating, Inc. · Section with this well →
| Caddo | 4,970 | -4,020 |
| Weir | — | |
| Atoka | — | |
| Bryson | — | |
| Butram | — | |
| Canyon | — | |
| Gunsight | — | |
| Palo Pinto | — |
10 TOPS · FIRST 8
Johnson42-237-40658
0.6 KM · Caribou Operating, Inc. · Section with this well →
| Caddo | 5,000 | -4,050 |
| Weir | — | |
| Village Bend | — | |
| Gunsight | — | |
| Canyon | — | |
| Butram | — | |
| Bryson | — | |
| Atoka | — |
10 TOPS · FIRST 8
Pace42-237-39172
0.6 KM · Caribou Operating, Inc. · Section with this well →
| Conger L.S. | 2,375 | -1,296 |
| Vitlage Bend Sand | 2,580 | -1,501 |
| Strawn | 2,670 | -1,591 |
| Weir Sand | 2,795 | -1,716 |
| Strawn | 2,800 | -1,721 |
| Strawn | 3,150 | -2,071 |
| Bryson | 3,780 | -2,701 |
| Caddo | 5,065 | -3,986 |
South Briscoe42-237-40655
2.8 KM · Dry Creek Operating, LLC · Section with this well →
| Atoka | — | |
| Bryson | — | |
| Butram | — | |
| Caddo | — | |
| Canyon | — | |
| Gunsight | — | |
| Palo Pinto | — | |
| Strawn | — |
10 TOPS · FIRST 8
South Briscoe42-237-40628
3.0 KM · Dry Creek Operating, LLC · Section with this well →
| Gunsight | 618 | 368 |
| Palo Pinto | 896 | 90 |
| Weir | 1,060 | -74 |
| Strawn | 2,810 | -1,824 |
| Butram | 3,170 | -2,184 |
| Bryson | 3,756 | -2,770 |
| Village Bend | — | |
| Atoka | — |
10 TOPS · FIRST 8
South Briscoe42-237-40651
3.3 KM · Dry Creek Operating, LLC · Section with this well →
| Gunsight | 626 | 333 |
| Palo Pinto | 886 | 73 |
| Weir | 1,050 | -91 |
| Strawn | 2,790 | -1,831 |
| Butram | 3,150 | -2,191 |
| Bryson | 3,792 | -2,833 |
| Caddo | 5,185 | -4,226 |
| Atoka | — |
10 TOPS · FIRST 8
South Briscoe42-237-40717
3.5 KM · Dry Creek Operating, LLC · Section with this well →
| Gunsight | 472 | 496 |
| Palo Pinto | 1,929 | -961 |
| Village Bend | 2,552 | -1,584 |
| Weir | 2,795 | -1,827 |
| Strawn | 3,033 | -2,065 |
| Butram | 3,046 | -2,078 |
| Bryson | 3,730 | -2,762 |
| Caddo | 5,063 | -4,095 |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23740606, documented in the API reference.