WELL · 42-237-40691 · DISTRICT 9
Plaster #1
Jack County · Sunset (Upper Strawn) field · Producing · Vertical
Plaster #1 (API 42-237-40691) is a well in Jack County operated by Jlw Operations LLC, completed August 4, 2025 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2025 and 2026, permitted to 2,500 ft.
Completion filings report 10 formation tops, including Palo Pinto, Village Bend, Weir, Strawn.
Its lease has reported 1 barrels of oil since August 2025, last reporting in July 2026.
Operator of record
Lubbock, TX · P-5 Y, filed Mar 4, 2026 · 9 permits on file · (940) 631-7134
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | JLW Operations LLC |
| Production reports | JLW Operations, LLCthrough Aug 2025 |
| Latest permit | JLW Operations, LLCSep 4, 2026 |
- 2,500
- total depth, ft
- 2
- permits on file
- Sep 4, 2026
- last permit issued
- Aug 4, 2025
- completed
- 1
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2025 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 4, 2025
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
33.207165, -98.194682
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Jack County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Plaster O-13-34432 | Sunset (Upper Strawn) | JLW Operations, LLC | 1 | 1 | 0 | Aug 2025 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1JLW Operations, LLCAug 2025 → Aug 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 918199-99 | Recompletion | JLW Operations, LLC | Aug 26, 2026 | Sep 4, 2026 | — | 2,400 |
| 908760-99 | Drill | JLW Operations, LLC | Jun 22, 2025 | Jun 25, 2025 | Jul 16, 2025 | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-34432 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,113 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,964 | 1,976 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 380 | 12.25 | 250 S |
| 5.5 | 2,338 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 15, 2026 | Sep 8, 2026 | — |
| 00 | Jan 16, 2026 | Oct 14, 2025 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-40691 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-40691 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Richards Ranch42-237-40498
1.2 KM · White Knight Production LLC · Section with this well →
| Palo Pinto | 1,042 | 78 |
| Strawn | 1,283 | -163 |
| Weir | 1,972 | -852 |
| Bryson | 2,966 | -1,846 |
| Caddo | 4,676 | -3,556 |
| Atoka | 4,941 | -3,821 |
| Canyon | — | |
| Village Bend | — |
10 TOPS · FIRST 8
Edens42-237-40139
1.8 KM · White Knight Production LLC · Section with this well →
| Palo Pinto | 1,021 | 111 |
| Strawn | 1,260 | -128 |
| Caddo | 4,620 | -3,488 |
| Atoka | 4,706 | -3,574 |
| Weir | — | |
| Bryson | — | |
| Butram | — | |
| Canyon | — |
10 TOPS · FIRST 8
Richards Ranch42-237-40029
2.0 KM · Newark E&P Operating, LLC · Section with this well →
| Palo Pinto | 1,050 | 113 |
| Strawn | 1,289 | -126 |
| Caddo | 4,676 | -3,513 |
| Bend | 5,059 | -3,896 |
| Marble Falls | 5,265 | -4,102 |
| Barnett | 5,773 | -4,610 |
| Ellenburger | 6,018 | -4,855 |
| Gunsight | — |
14 TOPS · FIRST 8
Jacksboro, S. (1975) Unit42-237-40659
2.1 KM · Pecos Country Operating Inc. · Section with this well →
| Weir | 1,966 | -844 |
| Village Bend | — | |
| Strawn | — | |
| Palo Pinto | — | |
| Gunsight | — | |
| Canyon | — | |
| Caddo | — | |
| Butram | — |
10 TOPS · FIRST 8
Jacksboro, S. (1975) Unit42-237-40640
2.1 KM · Pecos Country Operating Inc. · Section with this well →
| Weir | 1,964 | -855 |
| Village Bend | — | |
| Atoka | — | |
| Bryson | — | |
| Butram | — | |
| Caddo | — | |
| Canyon | — | |
| Gunsight | — |
10 TOPS · FIRST 8
Jacksboro, S. (1975) Unit42-237-40610
2.2 KM · Myers, A. J. · Section with this well →
| Weir | 1,960 | -845 |
| Atoka | — | |
| Bryson | — | |
| Butram | — | |
| Caddo | — | |
| Canyon | — | |
| Gunsight | — | |
| Palo Pinto | — |
10 TOPS · FIRST 8
Jacksboro, S. (1975) Unit42-237-40665
2.2 KM · Pecos Country Operating Inc. · Section with this well →
| Weir | 1,964 | -846 |
| Atoka | — | |
| Village Bend | — | |
| Strawn | — | |
| Palo Pinto | — | |
| Gunsight | — | |
| Canyon | — | |
| Caddo | — |
10 TOPS · FIRST 8
Jacksboro, S. (1975) Unit42-237-40641
2.3 KM · Pecos Country Operating Inc. · Section with this well →
| Weir | 1,964 | -848 |
| Bryson | — | |
| Butram | — | |
| Caddo | — | |
| Canyon | — | |
| Gunsight | — | |
| Palo Pinto | — | |
| Strawn | — |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23740691, documented in the API reference.