WELL · 42-239-00880 · DISTRICT 2

Ross Hanna #2

Plugged

Jackson County · Mayo (5460) field  · Vertical

Ross Hanna #2 (API 42-239-00880) is a plugged well in Jackson County, plugged March 12, 2001, last operated by Sue-Ann Production Company.

The RRC has issued 4 drilling permits (amended once) between 1980 and 1990, permitted to 6,700 ft.

Operator of record

Sue-Ann Production Company

Based in
Victoria, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 12, 2000
Permits on file
246
Phone
(361) 576-6090

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSue-Ann Production Company
Production reportsShell Western E&P Inc.through Nov 1995
Latest permitSue-Ann Production CompanyDec 12, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
5
permits on file
Dec 12, 1990
last permit issued
May 31, 1990
completed
0
cumulative oil, bbl
43.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 31, 1990
Shut in
—
Plugged
Mar 12, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hanna Ross (Ross GU) G-2-137771Ganado (F-3-H, Lower)Sue-Ann Operating, L.C.1043.7KJan 1993 – Mar 2001
— G-2-134978——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sue-Ann Production CompanyJan 1993 → Aug 1995
  2. 2Shell Western E&P Inc.Sep 1995 → Nov 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
381856-99RecompletionSue-Ann Production CompanyDec 4, 1990Dec 12, 1990Dec 27, 19906,700
373654-98RecompletionSue-Ann Production CompanyJun 8, 1990May 22, 1990—6,700
373654-99RecompletionSue-Ann Production CompanyMay 21, 1990May 22, 1990—6,700
127895-99RecompletionTexaco Inc.Jul 30, 1981Jul 30, 1981—6,700
90472-99RecompletionTexaco Inc.Aug 21, 1980Aug 21, 1980—6,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-134978————
—— G-2-137771————

Perforations

Perforated and open-hole intervals.

FromToType
5,081—Perforated
5,4505,454Perforated
5,6695,673Perforated
6,4116,420Perforated
6,4456,455Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,13912.25250 S
9.6251,139——
2.3756,306——
2.3756,311——
5.56,4858.75300 S
5.56,485—300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 5, 1991Jan 10, 1991Yes
00Apr 26, 1991——
00Oct 3, 1990Jun 7, 1990Yes
00Aug 2, 1990——
00Jan 12, 1984Jun 21, 1982—
00Jan 12, 1984Nov 26, 1980—
00Jan 12, 1984Oct 1, 1973—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
156K
bbl, all reported
Dec 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000044563UIC PermitPlugged Apr 10, 20011,0003,0006,413–6,418

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119931994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23900880, documented in the API reference.