TEXAS · WELLS · JACKSON COUNTY · API 42-239-01070 · DISTRICT 02
Scott A.J. et Al #2
Jackson County · Stewart (6220) field · Vertical
Scott A.J. ET AL #2 (API 42-239-01070) is a plugged well in Jackson County, plugged August 13, 1985, last operated by Brothers Well Service Inc..
The RRC has issued one drilling permit, issued March 27, 1984, permitted to 6,272 ft.
It was permitted by Ganado Energy Associates, Inc. and has since transferred to Brothers Well Service Inc. on the wellbore schedule.
Operator of record
Permitted by Ganado Energy Associates, Inc.; the EWA schedule now lists a different operator.
- Based in
- El Campo, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 16, 2004
- Phone
- (979) 543-6851
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brothers Well Service Inc. |
| Production reports | none |
| Latest permit | Ganado Energy Associates, Inc.Mar 27, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,272
- total depth, ft
- 1
- permits on file
- Mar 27, 1984
- last permit issued
- Apr 5, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 5, 1984
- Shut in
- —
- Plugged
- Aug 13, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 233636-99 | Other | Ganado Energy Associates, Inc. | Mar 12, 1984 | Mar 27, 1984 | — | 6,272 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 5, 1984 | Scott A.J. et Al O-2-6767 | Stewart (6220) | Brothers Well Service Inc. | Plugged | — |
| Mar 22, 1959 | Lind Arthur F. O-2-2495 | Stewart (Deep) | Howell H. H. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,232 | 6,234 | Perforated |
| 6,235 | 6,241 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 108 | — | — |
| 10.75 | 108 | 15 | — |
| 5.5 | 6,276 | 8.875 | — |
| 5.5 | 6,278 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 27, 1984 | Jun 25, 1984 | — |
| 00 | Sep 26, 1984 | Jun 25, 1984 | — |
| 00 | Jan 12, 1984 | Apr 1, 1959 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-01070 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-01070 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23901070, documented in the API reference.