TEXAS · WELLS · JACKSON COUNTY · HINSHAW, O. G. LEASE · API 42-239-02060 · DISTRICT 02

Hinshaw O. G. #6

Shut in

Jackson County · Lolita (Toney Zone) field · Shut In  · Vertical

Hinshaw O. G. #6 (API 42-239-02060) is a well in Jackson County operated by Mcgowan Working Partners Inc., completed April 17, 1987 and listed as shut in on the RRC schedule, shut in January 1, 1998.

The RRC has issued one drilling permit, issued March 31, 1987, permitted to 5,936 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Its lease has reported 687 barrels of oil and 12 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

McGowan Working Partners Inc.

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Jackson, MS
P-5 status
Active (A)
P-5 last filed
Oct 27, 2025
Permits on file
60
Phone
(601) 982-3444

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Dec 1993
Latest permitMobil Producing TX. & N.M. Inc.Mar 31, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,936
total depth, ft
1
permits on file
Mar 31, 1987
last permit issued
Apr 17, 1987
completed
687
cumulative oil, bbl
12
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1993

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 17, 1987
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hinshaw, O. G. O-2-7167Lolita (Toney Zone)McGowan Working Partners, Inc.268712Jan 1993 – Dec 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Company, L. P.Jan 1993 → Dec 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
328478-99RecompletionMobil Producing TX. & N.M. Inc.Mar 31, 1987Mar 31, 1987—5,936

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 17, 1987Hinshaw O. G. O-2-7167Lolita (Toney Zone)McGowan Working Partners Inc.Shut In · shut in Jan 1, 19985,936
—Hinshaw O. G. O-2-927Lolita (Ward Zone)Mobil Producing TX. & N.M. Inc.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
5,6785,686Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,314——
5.55,934——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 19, 1987Oct 26, 1987Yes
00Nov 6, 1987——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902060, documented in the API reference.