TEXAS · WELLS · JACKSON COUNTY · G-2-83038 LEASE · API 42-239-02369 · DISTRICT 02

West Ranch -A- #14

Plugged

Jackson County · West Ranch (3650) field  · Vertical

Fields on the latest permit · any of 3
West Ranch (Noble) · West Ranch (3650) · West Ranch (3800)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

West Ranch -A- #14 (API 42-239-02369) is a plugged well in Jackson County, plugged February 21, 1991, last operated by Mobil Producing TX. & N.M. Inc..

The RRC has issued one drilling permit, issued November 27, 1978, permitted to 5,478 ft.

It was permitted by Mobil Oil Corporation and has since transferred to Mobil Producing TX. & N.M. Inc. on the wellbore schedule.

Operator of record

Mobil Producing TX. & N.M. Inc.

Permitted by Mobil Oil Corporation; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jun 4, 2025
Permits on file
6,763
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsnone
Latest permitMobil Oil CorporationNov 27, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,478
total depth, ft
1
permits on file
Nov 27, 1978
last permit issued
Jun 10, 1980
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 10, 1980
Shut in
—
Plugged
Feb 21, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-2-83038——000—

No volumes reported on these leases in the last three years.

Wells named West Ranch -A-

Mobil Producing TX. & N.M. Inc.'s other wells filed under this lease name in Jackson County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
37555-99RecompletionMobil Oil CorporationNov 27, 1978Nov 27, 1978—5,478

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 10, 1980West Ranch -A- G-2-83038West Ranch (3650)Mobil Producing TX. & N.M. Inc.Plugged—
—West Ranch -A- O-2-3207West Ranch (Toney)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
3,6623,789Perforated
—5,093Perforated
—5,503Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,327——
2.3753,716——
75,098——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 13, 1979—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902369, documented in the API reference.