TEXAS · WELLS · JACKSON COUNTY · API 42-239-02381 · DISTRICT 02

West Ranch A #26

Plugged

Jackson County · West Ranch (41-a & 98-a Cons.) field  · Vertical

West Ranch A #26 (API 42-239-02381) is a plugged well in Jackson County, plugged August 3, 2017, last operated by Hilcorp Energy Company.

The RRC has issued 4 drilling permits between 1977 and 2007, permitted to 6,346 ft.

Completion filings report one formation top, including No Change.

Its 2 leases have reported 52 barrels of oil and 406K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Mar 2008
Latest permitHilcorp Energy CompanyNov 5, 2007
6,346
total depth, ft
4
permits on file
Nov 5, 2007
last permit issued
Nov 2, 2007
completed
52
cumulative oil, bbl
406K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 2, 2007
Shut in
—
Plugged
Aug 3, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch 'A' G-2-232763West Ranch (41-a & 98-a Cons.)Hilcorp Energy Company107.8KNov 2007 – Mar 2008
West Ranch -A- G-2-127170West Ranch (Ward)Hilcorp Energy Company152398KJan 1993 – May 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Mar 1993 → Apr 1994
  2. 2Vintage Petroleum, Inc.Jun 2003 → Apr 2006
  3. 3Vintage Petroleum, LLCMay 2006 → May 2007
  4. 4Hilcorp Energy CompanyDec 2007 → Mar 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
648478-99RecompletionHilcorp Energy CompanyOct 25, 2007Nov 5, 2007Oct 25, 20076,346
342896-99RecompletionMobil Producing TX. & N.M. Inc.Feb 19, 1988Mar 17, 1988—5,780
320666-99RecompletionMobil Producing TX. & N.M. Inc.Sep 17, 1986Sep 20, 1986—6,346
14686-99RecompletionMobil Oil CorporationDec 27, 1977Dec 27, 1977—6,346

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 2, 2007West Ranch A G-2-232763West Ranch (41-a & 98-a Cons.)Hilcorp Energy CompanyPlugged—
Jun 10, 2003West Ranch -A- G-2-127170West Ranch (Ward)Hilcorp Energy CompanyPlugged—
Dec 2, 1986West Ranch -A- O-2-4052West Ranch (Mitchell)Hilcorp Energy CompanyPlugged—
Dec 2, 1986West Ranch -A- O-2-4052West Ranch (Mitchell)Hilcorp Energy CompanyPlugged—
Mar 7, 1978West Ranch -A- O-2-4052West Ranch (Mitchell)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1703West Ranch (98-A)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-4052West Ranch (Mitchell)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1640West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 33 ft elevation.Download CSV →

FormationMD ftSubsea
NO Change——

Perforations

Perforated and open-hole intervals.

FromToType
5,1425,148Perforated
5,6155,639Perforated
5,6915,697Perforated
5,6915,720Perforated
5,7305,734Perforated
5,7865,792Perforated
—5,600Perforated
—5,750Perforated
—6,145Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75327——
10.751,3279.875775 S
10.751,328——
75,5336.75528 S
75,533——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 12, 2008Jan 2, 2008Yes
00Feb 4, 2008——
00Dec 10, 2003Jul 1, 2003—
00May 11, 1993Feb 25, 1993—
00Jul 29, 1988Apr 28, 1988Yes
00Jun 4, 1988——
00Jan 2, 1987Dec 17, 1986—
00May 1, 1986Mar 17, 1978—
00Jan 12, 1984Mar 17, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 1990
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000002018H-1 InjectionPlugged Aug 28, 2017000–0

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011990

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902381, documented in the API reference.