TEXAS · WELLS · JACKSON COUNTY · API 42-239-02384 · DISTRICT 02

West Ranch -A- #29

Shut in

Jackson County · West Ranch (Ward) field · Observation  · Vertical

West Ranch -A- #29 (API 42-239-02384) is a well in Jackson County operated by Hilcorp Energy Company, completed August 1, 2017 and listed as observation on the RRC schedule, shut in September 1, 2026.

The RRC has issued 7 drilling permits between 1978 and 2004, permitted to 6,544 ft.

It was permitted by Vintage Petroleum, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta.

Its 3 leases have reported 6M barrels of oil and 5.84M mcf of gas since January 1993, last reporting in July 2026. The leases carry 288 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Vintage Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitVintage Petroleum, Inc.Mar 5, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,544
total depth, ft
7
permits on file
Mar 5, 2004
last permit issued
Aug 1, 2017
completed
6M
cumulative oil, bbl
5.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 1, 2017
Shut in
Sep 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 288 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- G-2-205337West Ranch (Ward)Hilcorp Energy Company10202KMar 2004 – Jul 2026
West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy Company2876M5.64MJan 1993 – Jul 2026
— G-2-113310——000—

Oil, barrels lease total

Last 12 months 74,228 · prior 12 84,801(-12%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 27,020 · prior 12 53,020(-49%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
  2. 2Meridian Oil Inc.Mar 1996 → Jul 1996
  3. 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
  4. 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
  5. 5Vintage Petroleum, LLCMay 2006 → Jul 2007
  6. 6Hilcorp Energy CompanyAug 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
542884-99RecompletionVintage Petroleum, Inc.Mar 5, 2004Mar 5, 2004Mar 7, 20045,740
399908-99RecompletionMobil Producing TX. & N.M. Inc.Jun 3, 1992Jun 3, 1992Jun 1, 19926,544
250845-99RecompletionMobil Producing TX. & N.M. Inc.Aug 31, 1984Sep 10, 1984—6,549
156048-99RecompletionMobil Producing TX. & N.M. Inc.Apr 8, 1982Apr 8, 1982—5,570
43498-99RecompletionMobil Oil CorporationFeb 21, 1979Feb 21, 1979—5,700
41691-99RecompletionMobil Oil CorporationJan 30, 1979Jan 30, 1979—5,700
22669-99RecompletionMobil Oil CorporationApr 24, 1978Apr 24, 1978—5,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 1, 2017West Ranch -A- G-2-205337West Ranch (Ward)Hilcorp Energy CompanyObservation · shut in Sep 1, 20266,544
Jun 6, 1992West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyShut In · shut in Jan 1, 20006,544
Mar 29, 1988West Ranch -A- G-2-113310West Ranch (Ward)Mobil Producing TX. & N.M. Inc.Not on Schedule—
Jun 12, 1982West Ranch -A- G-2-81903West Ranch (Menefee 5500)Mobil Producing TX. & N.M. Inc.Not on Schedule—
Jun 12, 1982West Ranch -A- G-2-81903West Ranch (Menefee 5500)Mobil Producing TX. & N.M. Inc.Not on Schedule—
Jul 14, 1978West Ranch -A- O-2-4052West Ranch (Mitchell)Hilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 45 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula4,261-4,216
Frio5,000-4,955
Gretta5,102-5,057

Perforations

Perforated and open-hole intervals.

FromToType
5,1365,148Perforated
5,154—Perforated
5,5365,597Perforated
5,6235,641Perforated
5,6965,730Perforated
5,6975,704Perforated
5,7325,738Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,325——
10.751,32613.5775 S
10.751,32614775 S
10.751,326——
2.3755,303——
2.3755,396——
75,5488.75528 S
75,5489.875528 S
75,548——
10.75———
7———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 21, 2019Nov 2, 2017—
00Apr 11, 2005Apr 15, 2004Yes
00Jan 13, 2005——
00Oct 14, 1992Jun 29, 1992Yes
00Jul 14, 1992——
00May 9, 1988Apr 18, 1988—
00Nov 27, 1984Sep 24, 1984—
00Nov 8, 1984Sep 6, 1984—
00Jan 12, 1984Apr 27, 1979—
00Jan 12, 1984Jul 31, 1978—
00Jan 12, 1984Sep 8, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000116420H-1 InjectionNot activated10,0002,8505,700–6,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902384, documented in the API reference.