TEXAS · WELLS · JACKSON COUNTY · WEST RANCH -A- LEASE · API 42-239-02399 · DISTRICT 02

West Ranch -A- #44

Plugged

Jackson County · West Ranch (Marginulina 5000) field  · Vertical

West Ranch -A- #44 (API 42-239-02399) is a plugged well in Jackson County, plugged May 31, 2017, last operated by Hilcorp Energy Company.

The RRC has issued one drilling permit, issued April 24, 1980, permitted to 5,562 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Marg. 5000, Greta.

Its lease has reported 12.3K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Feb 2006
Latest permitMobil Producing TX. & N.M. Inc.Apr 24, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,562
total depth, ft
1
permits on file
Apr 24, 1980
last permit issued
Jun 8, 2005
completed
0
cumulative oil, bbl
12.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2005 THROUGH Feb 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 8, 2005
Shut in
—
Plugged
May 31, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- G-2-87621West Ranch (Marginulina 5000)Hilcorp Energy Company1012.3KJan 1993 – Feb 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Vintage Petroleum, Inc.Jun 2005 → Feb 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
79040-99RecompletionMobil Producing TX. & N.M. Inc.Apr 24, 1980Apr 24, 1980—5,562

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 8, 2005West Ranch -A- G-2-87621West Ranch (Marginulina 5000)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 31 ft elevation.Download CSV →

FormationMD ftSubsea
Marg. 50005,029-4,998
Greta5,134-5,103

Perforations

Perforated and open-hole intervals.

FromToType
5,0295,053Perforated
5,0295,096Perforated
5,125—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,319——
2.3754,934——
75,125——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 27, 2006Aug 4, 2005Yes
00Jan 12, 1984May 5, 1980—
00Jan 12, 1984Jan 9, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902399, documented in the API reference.