TEXAS · WELLS · JACKSON COUNTY · WEST RANCH -A- LEASE · API 42-239-02437 · DISTRICT 02
West Ranch -A- #82
Jackson County · West Ranch (Greta) field · Observation · Vertical
West Ranch -A- #82 (API 42-239-02437) is a well in Jackson County operated by Hilcorp Energy Company, completed August 1, 2017 and listed as observation on the RRC schedule, shut in February 1, 2026.
The RRC has issued one drilling permit, issued June 16, 1978, permitted to 5,830 ft.
It was permitted by Mobil Oil Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including Catahoula, Frio, Gretta.
Its lease has reported 6.03M barrels of oil and 5.63M mcf of gas since the record begins in January 1993, last reporting volume in August 2026. The lease carries 287 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Mobil Oil Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Aug 2026 |
| Latest permit | Mobil Oil CorporationJun 16, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,830
- total depth, ft
- 1
- permits on file
- Jun 16, 1978
- last permit issued
- Aug 1, 2017
- completed
- 6.03M
- cumulative oil, bbl
- 5.63M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH AUG 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 1, 2017
- Shut in
- Feb 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 287 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | 287 | 6.03M | 5.63M | by Jan 1993 – Aug 2026 |
Oil, barrels lease total
Last 12 months 75,115 · prior 12 77,827(-3%)
Gas, mcf lease total
Last 12 months 35,191 · prior 12 56,503(-38%)
Wells named West Ranch -A-
Hilcorp Energy Company's other wells filed under this lease name in Jackson County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
- 2Meridian Oil Inc.Mar 1996 → Jul 1996
- 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
- 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
- 5Vintage Petroleum, LLCMay 2006 → Jul 2007
- 6Hilcorp Energy CompanyAug 2007 → Aug 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 26664-99 | Recompletion | Mobil Oil Corporation | Jun 16, 1978 | Jun 16, 1978 | — | 5,830 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 1, 2017 | West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | Observation · shut in Feb 1, 2026 | 5,830 |
| Jun 23, 1978 | West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | Not on Schedule | — |
| Dec 18, 1966 | West Ranch -A- O-2-1640 | West Ranch (Glasscock) | Hilcorp Energy Company | Not on Schedule | — |
| Dec 8, 1966 | West Ranch -A- O-2-1640 | West Ranch (Glasscock) | Hilcorp Energy Company | Not on Schedule | — |
| — | West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | Not on Schedule | — |
| — | West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 38 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,122 | 5,130 | Perforated |
| 5,522 | 5,556 | Perforated |
| — | 5,762 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,324 | 12.25 | 528 S |
| 9.625 | 1,324 | — | — |
| 1.5 | 5,001 | — | — |
| 2.375 | 5,045 | — | — |
| 5.5 | 5,125 | 8.625 | 528 S |
| 5.5 | 5,125 | — | — |
| 1.25 | 5,197 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 29, 2018 | Oct 26, 2017 | — |
| 00 | Jan 12, 1984 | Jun 4, 1979 | — |
| 00 | Jan 12, 1984 | Jul 14, 1978 | — |
| 00 | Jan 12, 1984 | Feb 27, 1967 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-02437 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-02437 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23902437, documented in the API reference.