TEXAS · WELLS · JACKSON COUNTY · WEST RANCH -A- LEASE · API 42-239-02439 · DISTRICT 02

West Ranch -A- #84

Plugged

Jackson County · West Ranch (Ward) field  · Vertical

West Ranch -A- #84 (API 42-239-02439) is a plugged well in Jackson County, plugged February 6, 1991, last operated by Hilcorp Energy Company.

The RRC has issued 2 drilling permits between 1982 and 1986, permitted to 5,764 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its lease has reported 267K barrels of oil and 5M mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 27 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough May 2019
Latest permitMobil Producing TX. & N.M. Inc.Jul 17, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,764
total depth, ft
2
permits on file
Jul 17, 1986
last permit issued
Aug 21, 1986
completed
267K
cumulative oil, bbl
5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 21, 1986
Shut in
—
Plugged
Feb 6, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 27 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- O-2-1677West Ranch (Ward)Hilcorp Energy Company27267K5MJan 1993 – May 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
  2. 2Meridian Oil Inc.Mar 1996 → Jul 1996
  3. 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
  4. 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
  5. 5Vintage Petroleum, LLCMay 2006 → Jul 2007
  6. 6Hilcorp Energy CompanyAug 2007 → Jun 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
304306-99RecompletionMobil Producing TX. & N.M. Inc.Jun 16, 1986Jul 17, 1986—5,764
158907-99RecompletionMobil Producing TX. & N.M. Inc.Apr 28, 1982Apr 28, 1982—5,547

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 21, 1986West Ranch -A- O-2-1677West Ranch (Ward)Hilcorp Energy CompanyPlugged—
May 27, 1982West Ranch -A- O-2-1640West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,4195,425Perforated
5,7395,747Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,330——
2.3755,379——
5.55,765——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 25, 1986Sep 4, 1986—
00Sep 20, 1986——
00Jan 12, 1984Jun 17, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902439, documented in the API reference.