TEXAS · WELLS · JACKSON COUNTY · WEST RANCH -A- LEASE · API 42-239-02451 · DISTRICT 02

West Ranch -A- #96D

Shut in

Jackson County · West Ranch (Other Zones) field · Observation  · Vertical

West Ranch -A- #96D (API 42-239-02451) is a well in Jackson County operated by Hilcorp Energy Company, completed August 1, 2017 and listed as observation on the RRC schedule, shut in February 1, 2026.

The RRC has issued one drilling permit, issued November 25, 1980, permitted to 5,954 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitMobil Producing TX. & N.M. Inc.Nov 25, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,954
total depth, ft
1
permits on file
Nov 25, 1980
last permit issued
Aug 1, 2017
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 1, 2017
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 35 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- O-2-1661West Ranch (Other Zones)Hilcorp Energy Company3500Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
100368-99RecompletionMobil Producing TX. & N.M. Inc.Nov 25, 1980Nov 25, 1980—5,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 1, 2017West Ranch -A- O-2-1661West Ranch (Other Zones)Hilcorp Energy CompanyObservation · shut in Feb 1, 20265,954
Aug 19, 1977West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyNot on Schedule—
—West Ranch -A- O-2-1677West Ranch (Ward)Hilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 43 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula4,261-4,218
Frio5,000-4,957
Gretta5,102-5,059

Perforations

Perforated and open-hole intervals.

FromToType
4,3874,418Perforated
5,8355,922Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,30512.25528 S
9.6251,30512.5528 S
9.6251,305——
2.8754,367——
5.55,767—760 S
5.55,7698.625528 S
5.55,7698.755,282 S
5.55,769——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 21, 2019Nov 2, 2017—
00Jun 17, 1987May 29, 1987—
00Jun 3, 1987May 6, 1987—
00May 11, 1987Apr 27, 1987—
00Jan 12, 1984Feb 17, 1981—
00Jan 12, 1984Sep 6, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
12.6M
bbl, all reported
Jun 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000039885W-14 DisposalCanceled Dec 16, 201510,0002,0004,340–4,525
000002034H-1 InjectionCanceled Feb 6, 1984000–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902451, documented in the API reference.