TEXAS · WELLS · JACKSON COUNTY · G-2-85817 LEASE · API 42-239-02462 · DISTRICT 02

West Ranch -A- #107

Plugged

Jackson County · West Ranch (Glasscock) field  · Vertical

Permitted field
West Ranch (Greta)

West Ranch -A- #107 (API 42-239-02462) is a plugged well in Jackson County, plugged February 27, 1991, last operated by Mobil Producing TX. & N.M. Inc..

The RRC has issued 2 drilling permits between 1985 and 1986, permitted to 5,541 ft.

Operator of record

Mobil Producing TX. & N.M. Inc.

Based in
Spring, TX
P-5 status
Delinquent (D)
P-5 last filed
Jun 4, 2025
Permits on file
6,763
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsnone
Latest permitMobil Producing TX. & N.M. Inc.Jul 7, 1986
5,541
total depth, ft
2
permits on file
Jul 7, 1986
last permit issued
Oct 4, 1986
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 4, 1986
Shut in
—
Plugged
Feb 27, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-2-85817——000—

No volumes reported on these leases in the last three years.

Wells named West Ranch -A-

Mobil Producing TX. & N.M. Inc.'s other wells filed under this lease name in Jackson County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
303950-99RecompletionMobil Producing TX. & N.M. Inc.Jun 5, 1986Jul 7, 1986—5,541
272045-99RecompletionMobil Producing TX. & N.M. Inc.Mar 4, 1985Apr 5, 1985—5,541

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 4, 1986West Ranch -A- G-2-85817West Ranch (Glasscock)Mobil Producing TX. & N.M. Inc.Plugged—
Oct 4, 1986West Ranch -A- G-2-85817West Ranch (Glasscock)Mobil Producing TX. & N.M. Inc.Plugged—
Jul 8, 1978West Ranch -A- O-2-1640West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—
—West Ranch -A- G-2-83355West Ranch (Glasscock)Mobil Oil CorporationPlugged—
—West Ranch -A- G-2-71308West Ranch (Glasscock)Mobil Oil CorporationPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,0945,106Perforated
5,4305,434Perforated
5,4915,513Perforated
5,4915,525Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37560——
9.6251,309——
9.6251,325—528 S
2.3755,409——
5.55,541—528 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 19, 1986Oct 16, 1986—
00Aug 23, 1985Jul 22, 1985—
00Jan 12, 1984Jul 13, 1982—
00Jan 12, 1984Jul 25, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902462, documented in the API reference.