TEXAS · WELLS · JACKSON COUNTY · WEST RANCH -A- LEASE · API 42-239-02570 · DISTRICT 02

West Ranch -A- #215

Shut in

Jackson County · West Ranch (Marginulina 5000) field · Observation  · Vertical

West Ranch -A- #215 (API 42-239-02570) is a well in Jackson County operated by Hilcorp Energy Company, completed August 1, 2017 and listed as observation on the RRC schedule, shut in February 1, 2026.

The RRC has issued 3 drilling permits (amended once) between 1983 and 1989, permitted to 5,750 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta.

Its lease has reported 236K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2007
Latest permitMobil Producing TX. & N.M. Inc.Dec 18, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,750
total depth, ft
4
permits on file
Dec 18, 1989
last permit issued
Aug 1, 2017
completed
0
cumulative oil, bbl
236K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2007

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 1, 2017
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- G-2-133734West Ranch (Marginulina 5000)Hilcorp Energy Company10236KJan 1993 – Aug 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Jan 1993 → Jun 1994
  2. 2Vintage Petroleum, Inc.Jan 2002 → Feb 2002
  3. 3Vintage Petroleum, LLCFeb 2007 → Jul 2007
  4. 4Hilcorp Energy CompanyAug 2007 → Aug 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
367689-98RecompletionMobil Producing TX. & N.M. Inc.Mar 26, 1991Dec 18, 1989—5,750
367689-99RecompletionMobil Producing TX. & N.M. Inc.Dec 15, 1989Dec 18, 1989—5,750
332577-99RecompletionMobil Producing TX. & N.M. Inc.Jul 7, 1987Jul 7, 1987—7,000
206185-99RecompletionMobil Producing TX. & N.M. Inc.Jun 22, 1983Jul 29, 1983—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 1, 2017West Ranch -A- G-2-133734West Ranch (Marginulina 5000)Hilcorp Energy CompanyObservation · shut in Feb 1, 20265,750
Sep 4, 1987West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyNot on Schedule—
Sep 4, 1987West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyNot on Schedule—
Sep 25, 1941West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyNot on Schedule—
Sep 25, 1941West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyNot on Schedule—
—West Ranch -A- G-2-52657West Ranch (Menefee 5500)Mobil Producing TX. & N.M. Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 28 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula4,261-4,233
Frio5,000-4,972
Gretta5,102-5,074

Perforations

Perforated and open-hole intervals.

FromToType
5,0365,046Perforated
5,0875,092Perforated
5,0925,096Perforated
5,0935,096Perforated
5,7455,749Perforated
—5,745Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,31312.25528 S
9.6251,313—528 S
5.55,7508.75528 S
5.55,750—528 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 13, 2019Oct 19, 2017—
00Aug 2, 1990Feb 20, 1990Yes
00Jun 2, 1990——
00Nov 12, 1987Oct 19, 1987—
00Nov 18, 1986Nov 7, 1986—
00Mar 9, 1984Dec 1, 1983—
00Feb 27, 1984Dec 1, 1983—
00Jan 12, 1984Jun 13, 1972—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902570, documented in the API reference.