TEXAS · WELLS · JACKSON COUNTY · WEST RANCH -A- LEASE · API 42-239-02632 · DISTRICT 02

West Ranch -A- #284

Shut in

Jackson County · West Ranch (Greta) field · Observation  · Vertical

West Ranch -A- #284 (API 42-239-02632) is a well in Jackson County operated by Hilcorp Energy Company, completed August 1, 2017 and listed as observation on the RRC schedule, shut in February 1, 2026.

The RRC has issued 3 drilling permits between 1978 and 1986, permitted to 6,335 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta - Disposal.

Its lease has reported 6.03M barrels of oil and 5.63M mcf of gas since the record begins in January 1993, last reporting volume in August 2026. The lease carries 287 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2026
Latest permitMobil Producing TX. & N.M. Inc.Sep 20, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,335
total depth, ft
3
permits on file
Sep 20, 1986
last permit issued
Aug 1, 2017
completed
6.03M
cumulative oil, bbl
5.63M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 1, 2017
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 287 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy Company2876.03M5.63Mby Jan 1993 – Aug 2026

Oil, barrels lease total

Last 12 months 75,115 · prior 12 77,827(-3%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 35,191 · prior 12 56,503(-38%)

010K20K202420252026

Wells named West Ranch -A-

Hilcorp Energy Company's other wells filed under this lease name in Jackson County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
  2. 2Meridian Oil Inc.Mar 1996 → Jul 1996
  3. 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
  4. 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
  5. 5Vintage Petroleum, LLCMay 2006 → Jul 2007
  6. 6Hilcorp Energy CompanyAug 2007 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
320667-99RecompletionMobil Producing TX. & N.M. Inc.Sep 17, 1986Sep 20, 1986—5,200
253371-99RecompletionMobil Producing TX. & N.M. Inc.Oct 2, 1984Oct 2, 1984—5,735
20412-99RecompletionMobil Oil CorporationMar 21, 1978Mar 21, 1978—6,355

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 1, 2017West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyObservation · shut in Feb 1, 20266,335
Apr 17, 1978West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyNot on Schedule—
—West Ranch -A- O-2-1703West Ranch (98-A)Hilcorp Energy CompanyNot on Schedule—
—West Ranch -A- O-2-1703West Ranch (98-A)Hilcorp Energy CompanyNot on Schedule—
—West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyNot on Schedule—
—West Ranch -A- O-2-2207West Ranch (Vanderbilt Sand)Hilcorp Energy CompanyNot on Schedule—
—West Ranch -A- G-2-72109West Ranch (Toney)Mobil Producing TX. & N.M. Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 41 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaCATAHOULA - DISPOSAL, H2S (CORDE4,320-4,279
FrioFRIO - DISPOSAL5,025-4,984
Gretta - Disposal5,115-5,074

Perforations

Perforated and open-hole intervals.

FromToType
5,1325,136Perforated
5,1415,146Perforated
5,1455,150Perforated
5,7465,750Perforated
6,259—Perforated
—6,145Perforated
—6,159Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,33615528 S
9.6251,336——
1.55,329——
1.55,535——
5.56,2158.75525 S
5.56,215——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 16, 2018Sep 25, 2017—
00Jul 20, 1987Jul 7, 1987—
00Dec 10, 1986Nov 7, 1986Yes
00Nov 19, 1986——
00Jan 12, 1984May 12, 1978—
00Jan 12, 1984Jul 14, 1977—
00Jan 12, 1984Apr 12, 1973—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902632, documented in the API reference.