TEXAS · WELLS · JACKSON COUNTY · G-2-85778 LEASE · API 42-239-02637 · DISTRICT 02

West Ranch -A- #289

Plugged

Jackson County · West Ranch (Marginulina 5000) field  · Vertical

West Ranch -A- #289 (API 42-239-02637) is a plugged well in Jackson County, plugged January 12, 1990, last operated by Mobil Producing TX. & N.M. Inc..

The RRC has issued one drilling permit, issued October 29, 1979, permitted to 5,605 ft.

Operator of record

Mobil Producing TX. & N.M. Inc.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jun 4, 2025
Permits on file
6,763
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsnone
Latest permitMobil Producing TX. & N.M. Inc.Oct 29, 1979
5,605
total depth, ft
1
permits on file
Oct 29, 1979
last permit issued
Dec 4, 1979
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 4, 1979
Shut in
—
Plugged
Jan 12, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-2-85778——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
62257-99RecompletionMobil Producing TX. & N.M. Inc.Oct 29, 1979Oct 29, 1979—5,605

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 4, 1979West Ranch -A- G-2-85778West Ranch (Marginulina 5000)Mobil Producing TX. & N.M. Inc.Plugged—
Apr 18, 1974West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1703West Ranch (98-A)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,9935,018Perforated
5,098—Perforated
5,7025,712Perforated
—6,130Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,318——
2.3754,904——
5.56,300——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jan 17, 1980—
00Jan 12, 1984Feb 24, 1977—
00Jan 12, 1984May 3, 1974—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000107799UIC PermitPlugged Feb 13, 19905,0001,7005,702–5,712

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902637, documented in the API reference.