TEXAS · WELLS · JACKSON COUNTY · API 42-239-02654 · DISTRICT 02
West Ranch A #306
Jackson County · Wildcat field · Vertical
West Ranch A #306 (API 42-239-02654) is a plugged well in Jackson County, plugged January 26, 1990, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued 2 drilling permits between 1987 and 1989, permitted to 5,480 ft.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Oct 18, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,480
- total depth, ft
- 2
- permits on file
- Oct 18, 1989
- last permit issued
- Nov 15, 1989
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 15, 1989
- Shut in
- —
- Plugged
- Jan 26, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 365089-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Oct 12, 1989 | Oct 18, 1989 | — | 5,420 |
| 334844-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Aug 20, 1987 | Aug 21, 1987 | — | 5,480 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 15, 1989 | West Ranch A O-2-7556 | Wildcat | Mobil Producing TX. & N.M. Inc. | Plugged | — |
| Sep 15, 1987 | West Ranch -A- O-2-6290 | West Ranch (Bennview) | Mobil Producing TX. & N.M. Inc. | Plugged | — |
| — | West Ranch -A- O-2-3207 | West Ranch (Toney) | Hilcorp Energy Company | Plugged | — |
| — | West Ranch -A- O-2-1640 | West Ranch (Glasscock) | Hilcorp Energy Company | Plugged | — |
| — | West Ranch -A- O-2-1640 | West Ranch (Glasscock) | Hilcorp Energy Company | Plugged | — |
| — | West Ranch -A- O-2-1640 | West Ranch (Glasscock) | Hilcorp Energy Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,425 | 5,432 | Perforated |
| 5,572 | 5,595 | Perforated |
| — | 5,517 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,340 | 12.25 | 500 S |
| 9.625 | 1,340 | — | — |
| 2.375 | 5,484 | — | — |
| 5.5 | 5,611 | 8.75 | 500 S |
| 5.5 | 5,611 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 1990 | Dec 14, 1989 | Yes |
| 00 | Feb 10, 1990 | — | — |
| 00 | Nov 24, 1987 | Nov 1, 1987 | Yes |
| 00 | Nov 16, 1987 | — | — |
| 00 | May 25, 1984 | — | — |
| 00 | Jan 12, 1984 | Apr 28, 1983 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-02654 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-02654 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 689K
- bbl, all reported
- Dec 1988
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000047692 | H-1 Injection | Plugged Feb 20, 1990 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23902654, documented in the API reference.