TEXAS · WELLS · JACKSON COUNTY · API 42-239-02654 · DISTRICT 02

West Ranch A #306

Plugged

Jackson County · Wildcat field  · Vertical

West Ranch A #306 (API 42-239-02654) is a plugged well in Jackson County, plugged January 26, 1990, last operated by Mobil Producing TX. & N.M. Inc..

The RRC has issued 2 drilling permits between 1987 and 1989, permitted to 5,480 ft.

Operator of record

Mobil Producing TX. & N.M. Inc.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jun 4, 2025
Permits on file
6,763
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitMobil Producing TX. & N.M. Inc.Oct 18, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,480
total depth, ft
2
permits on file
Oct 18, 1989
last permit issued
Nov 15, 1989
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 15, 1989
Shut in
—
Plugged
Jan 26, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
365089-99RecompletionMobil Producing TX. & N.M. Inc.Oct 12, 1989Oct 18, 1989—5,420
334844-99RecompletionMobil Producing TX. & N.M. Inc.Aug 20, 1987Aug 21, 1987—5,480

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 15, 1989West Ranch A O-2-7556WildcatMobil Producing TX. & N.M. Inc.Plugged—
Sep 15, 1987West Ranch -A- O-2-6290West Ranch (Bennview)Mobil Producing TX. & N.M. Inc.Plugged—
—West Ranch -A- O-2-3207West Ranch (Toney)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1640West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1640West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1640West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,4255,432Perforated
5,5725,595Perforated
—5,517Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,34012.25500 S
9.6251,340——
2.3755,484——
5.55,6118.75500 S
5.55,611——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 1990Dec 14, 1989Yes
00Feb 10, 1990——
00Nov 24, 1987Nov 1, 1987Yes
00Nov 16, 1987——
00May 25, 1984——
00Jan 12, 1984Apr 28, 1983—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
689K
bbl, all reported
Dec 1988
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000047692H-1 InjectionPlugged Feb 20, 1990000–0

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 0

01

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902654, documented in the API reference.